IEEE P802.11 - TASK GROUP Z - MEETING UPDATE


Status of Project IEEE 802.11z

Direct Link Setup

 

Chair – Menzo Wentink, Qualcomm

Secretary – Daniel Borges, Apple

 


Objective

AP independent direct link setup.

IEEE 802.11z PAR Document


 

Jacksonville, May 2008

 

Achievements

·        Resolved 35% of our technical comments

·        Added off-channel direct link

·        Discussed improved security and power saving

 

Submissons

·        11-08-0614-00-000z-tgz-jacksonville-meetingminutes.doc

·        11-08-0567-05-000z-tgz-jacksonville-agenda.ppt

·        11-08-0521-01-000z-tgz-lb127-comments.xls

·        11-08-0563-01-000z TGz CID 17-36 (7.1.3.1.6).doc

·        11-08-0564-01-000z TGz CID 38-69 (7.2.2.1).doc

·        11-08-0565-01-000z TGz CID 70-168 (7.2.2.1.x).doc

·        11-08-0566-01-000z TGz CID 478-595 (11.z1).doc

·        11-08-0542-00-000z-Scheduled-Peer-PSM.ppt

·        11-08-0541-00-000z-scheduled-Peer-PSM-new.doc

·        11-07-2762-06-000z-tunneled-direct-link-setup-with-channel-switching.doc

·        11-08-0304-03-000z-method-for-geting-link-rcpi.ppt

·        11-08-0305-02-000z-extended-usage-of-stksa.ppt

·        11-08-0531-00-000z-normative-text-for-extended-usage-of-stksa.doc

·        11-08-0532-00-000z-normative-text-for-tunneled-rcpi-measurement.doc

·        11-08-0476-00-000z-tgz-security-proposal.doc

·        11-08-0668-05-000z-peer-power-save-mode-for-tdls-normative-text.doc

 

Teleconferences

·        May 27 – topic: usage models

·        June 10 – topic: clause 10 (tentative)

·        July 1 – topic: power save

·        Noon ET, 1 hour

 

Denver July 2008 Goals

·        Further comment resolution

·        Agree on security and power saving

 

 

Orlando March 2008

 

Achievements

·        Added several items to the draft

1.      MIC definition

2.      path switch cleanup

3.      peer power save

·        Discussed other topics

1.      off-channel dls

2.      rcpi measurements

·        Approved TGz Draft 1.0 and 30 day LB

 

Submissons

·        11-08-0312-01-000z-clause-8-editorial-notes.doc

·        11-08-0311-00-000z-path-switch-cleanup.doc

·        11-08-0304-00-000z-method-for-geting-link-rcpi.ppt

·        11-08-0305-00-000z-extended-usage-of-stksa.ppt

·        11-08-0290-00-000z-tdls-setup.ppt

·        11-08-0309-00-000z-issueswithoffchanneltdls.ppt

·        11-07-2762-04-000z-tunneled-direct-link-setup-with-channel-switching.doc

·        11-08-0071-03-000z-normative-text-for-peer-power-save-mode.doc

·        11-08-0289-00-000z-frame-reorder-avoiding-in-tunneled-direct-link-setup.doc

 

Teleconferences

·         Tuesday April 22, April 29, May 6, 1 hour, 11am ET

 

Jacksonville May 2008 Goals

 

 

 

Taipei January 2008

 

Achievements

·        Heard presentations

·        Discussed updated draft text document

·        Determined further work to be done

 

Submissons

·        11-08-0029-01-000z-normative-text-for-path-selection-and-switch.doc

·        11-08-0070-00-000z-peer-power-save-mode.ppt

·        11-08-0071-00-0000v-normative text for draft

·        11-08-0073-000v-normative text for resolving a TDLS inconsistent security problem.doc

 

Output documents

·        11-08-0052-03-000z-tgz-atlanta-2007-agenda.ppt

·        11-08-0052-02-000z-tgz-atlanta-2007-agenda.ppt

·        11-08-0052-01-000z-tgz-atlanta-2007-agenda.ppt

·        11-08-0185-00-000z-tgz-minutes-for-Taipei-session.doc

·        11-08-0177-00-000z-tgz-January 2008 closing report.ppt

 

Teleconferences

·         The Task Group approved 3 teleconferences, to be held on Jan 29 2008, Feb 18 2008, March 3 2008, 11am EST

 

Orlando March 2008 Goals

 

 

Atlanta 2007 (November)

 

Achievements

·        Heard presentations

·        Discussed updated draft text document

·        Adopted TGz Draft 0.1

·        Determined further work to be done

 

Submissons

·        11-07-2515-08-0dls-tunneled-direct-link-setup

·        11-07-2762-00-000z-tunneled-direct-link-setup-with-channel-switching

·        11-07-2797-00-000z-path-selection-and-switch-mechanism

·        11-07-2760-00-000z-direct-transmission-in-PSM

·        11-07-2791-00-000z-avoid-frame-reordering -recover-active-state

·        11-07-2807-00-000z-dls-power-save-delivery

 

Output documents

·        11-07-2761-04-000z-tgz-atlanta-2007-agenda.ppt

·        11-07-2761-03-000z-tgz-atlanta-2007-agenda.ppt

·        11-07-2761-02-000z-tgz-atlanta-2007-agenda.ppt

·        11-07-2761-01-000z-tgz-atlanta-2007-agenda.ppt

·        11-07-2801-00-000z-tgz-atlanta-minutes-adhoc.doc

·        11-07-2854-00-000z-atlanta-nov-13-am2-meeting-minutes.doc

·        11-07-2919-01-000z-tgz-minutes-for-nov-15-session.doc

·        11-07-2907-00-000z-tgz-atlanta-closing-report.ppt

 

To-Do List

·        Discuss approach to channel switching

·        Add reason codes to path switch request/response

·        Prepare rationale and detail for direct link power save delivery (unscheduled and scheduled)

·        Should we address potential reordering on path switch when EDCA is used

·        Add sentence to exclude secure direct link when AP is not secure, think about possible solution for this case

 

Teleconferences

·         The Task Group approved 3 teleconferences, to be held on Nov 27, Dec 11, Jan 8, 10:30am EST

 

Ad Hocs

·         None planned.

 

Taipei 2008 Goals  (January)

 

Hawaii 2007 (September)

 

Achievements

·         Appointed secretary: Daniel Borges (Apple)

·         Heard presentations

·         Discussed and refined draft text document

·         Determined further work to be done

 

Submissons (no motions were brought forward to include the proposed text into the TGz draft)

·         11-07-2515-04-0dls-tunneled-direct-link-setup.doc

·         11-07-2515-02-0dls-tunneled-direct-link-setup.doc

·         11-07-2515-01-0dls-tunneled-direct-link-setup.doc

·         11-07-2489-01-0dls-fair-and-protected-dls.ppt

·         11-07-2515-00-0dls-tunneled-direct-link-setup.doc

·         11-07-2567-00-0dls-enhanced-direct-link-setup.ppt

 

Output documents

·         11-07-2514-03-0dls-tgz-september-2007-agenda.ppt

·         11-07-2514-02-0dls-tgz-september-2007-agenda.ppt

·         11-07-2514-01-0dls-tgz-september-2007-agenda.ppt

·         11-07-2514-00-0dls-tgz-september-2007-agenda.ppt

·         11-07-2203-01-0dls-san-francisco-minutes.doc

·         11-07-2203-01-0dls-san-francisco-minutes.doc

·         11-07-2461-00-0dls-closing-report.ppt

 

To-Do List

·         Security related

o   Move DH out of FTIE into own IE

§  Do the DH values need to be covered by the MIC?

o   Authentication when the AP has no security

o   PIN or passphrase type authentication

o   Change the HMAC SHA-256 to TGr KDF

o   Generate a key for the MIC

o   Check TGu and TGv multi-SSID/same-BSSID. May have to add additional conditions to avoid different security configurations between peer STAs.

·         Editorial

o   7.3.2.25.2 AKM values to be assigned by ANA (table 34).

·         General

o   Can we use the 11i pre-auth Ethertype, or do we have to get a new one?

·         New features

o   Off-channel TDLS?

 

Teleconferences

·         The Task Group approved 3 teleconferences, to be held on October 2, 16 and 30, 10am EST, 1-949-483-5001 or 1-866-454-2698, id 21212 21212 #.

 

Ad Hocs

·         None planned.

 

Atlanta 2007 Goals  (November)