Thanks for your comments. This is related to the fact that some PDs turn on their DC-DC (on top of their PD Cap) during inrush – so sometimes the cap may not be fully charged at the end of inrush leading to PD drawing more current leading to problems.  As per current standard it already gives a Voff that applies to DC-DC turn on.  But like I have pointed out, some people in the field have complained in the past that Voff applies only after PD has fully turned on, while several in the room said that is not the case.  That is all am trying to clarify with my suggested solution.

Thanks
Kousi

From: Jeff Heath <jheath@xxxxxxxxxx>
Date: Thursday, February 26, 2015 12:12 PM
To: Koussalya Balasubramanian <kobalasu@xxxxxxxxx>
Cc: "STDS-802-3-4PPOE@xxxxxxxxxxxxxxxxx" <STDS-802-3-4PPOE@xxxxxxxxxxxxxxxxx>
Subject: RE: [802.3_4PPOE] PD Load turn on

Hi Kousi,

 

This is a tricky problem thanks for tackling it. 

 

As I was not in the room when this got discussed I’m very likely missing some detail on the problem you are trying to solve.  This may be a benefit as I am just reading what is being proposed as a PD designer that was not ‘in the room’.  For instance I am not sure where you were planning on inserting the new text.  Sans that context your proposed wording may run into a problem of interpretation which could make existing compliant PDs non-compliant. 

 

 

PDs shall not draw more than the maximum current allowed by a PSE during inrush as outlined in section 33.2.7.5"

 

One valid reading of the proposed text could be that the PD must always stay under the PSE current limit during inrush.  Many PDs let the PSE handle the current limit during inrush which is currently allowed. 

 

I’m just guessing but is it the case that the turning on of the PD load causes the PSE to go back into current limit (after the PD has reached 99% of its final value)?  This could cause the PSE to go back into current limit and ‘fold back’ the voltage, which can cause the voltage at the PI to go below the Voff voltage. 

 

We have seen PDs that quickly charge up small capacitors, then turn on a load with no soft-start and expect the PSE just to deal with the consequences including the negative resistance of a DC to DC converter.  Depending on how the PSE has implemented Ilimit and foldback, it sometimes worked and sometimes did not.

 

If this is the case, maybe stating it explicitly would help.

 

“After the voltage at the PD PI has reached 99% of its final value, the PD shall stay under the minimum PSE current limit as defined by…”

 

BTW, the existing language of “Cport is charged 99% of its final value” has always been a bit troubling to me because the PD may not be know what the final value is, and Cport is an internal component not testable at the PD PI.  As far as I know the PSE is allowed to change its final voltage during inrush for instance.  I do NOT think there are problems in the field with this pedantic reading of the specification but it is kind of unclear.  If we are touching this, maybe we could think about referencing the PD PI for instance instead of an internal capacitor.  This is why I included PD PI language in my suggested text.

 

 

Regards,

 

Jeff Heath
Design Center Manager

Linear Technology Corporation

 

 

paper:

911 Olive Street

 

Santa Barbara, California 93101

voice:

805.965.1571

fax:

805.965.1701

computer:

jheath@xxxxxxxxxx

 

www.linear.com

 

 

From: Koussalya Balasubramanian (kobalasu) [mailto:kobalasu@xxxxxxxxx]
Sent: Thursday, February 26, 2015 11:09 AM
To: STDS-802-3-4PPOE@xxxxxxxxxxxxxxxxx
Subject: [802.3_4PPOE] PD Load turn on

 

Team

 

In Jan interim meeting, Jean and I presented about clarifying PD load turn on behavior that will help in making sure non-compliant behaviors are avoided.  The team directed us to submit this as a maintenance request.  Here is what we are planning on submitting – given the maintenance request will come back to 4PPoE group, we would appreciate any comment from 4PPoE group before we submit it.

 

Problem Statement:  

- PDs in the field turn on their Load during Inrush.  This leads to PD cap not charging up fully (even if C<180uf and PSE is following inrush rules from 33.2.7.5).  This may lead to operational problems after inrush.  There is a Voff requirement in PD table 33-18 to ensure power supply remains turned off for V<30V, but customers seem to read this as applicable only "after power on" not during "power on" - hence they turn on their DC-DC during inrush causing problems.

 

Suggested Solution

Add the following to section 33.3.7.3

"PDs shall not draw more than the maximum current allowed by a PSE during inrush as outlined in section 33.2.7.5"

Add the following to section 33.3.7.1 at the end of second paragraph.

"The turn off voltage Voff applies both during power on and after power on"

 