Hi all,

Question to the folks who came up with the various CC_DET_SEQs.... what was the design intent of sequence 3 ?
I have the feeling there is a difference in interpretation of what is meant by "staggered" and "parallel".

For sequence 0, it is stated that "Connection Check is followed by staggered detection for a single-signature PD and parallel detection for a dual-signature PD."

Does 'parallel detection' imply that the detection has to happen precisely at the same time ?
Or can you do detect on pri, then detect on sec, and then proceed to classification ?

I would assert that the latter behavior is allowed by the state diagram.
Even if do_detect_pri and do_detect_sec are called at the same time, nothing forbids one of these functions to wait a bit until the other is done.

Kind regards,

Lennart

On Fri, Sep 1, 2017 at 3:10 AM, Heath Stewart <00000855853231d4-dmarc-request@xxxxxxxx> wrote:
Yair,

Thanks for your presentation. There are some interesting issues you identify in comments 251 and 252. We have reflected on your proposal and have created a proposal to address these issues.

Thanks,

-Heath Stewart


On Thu, Aug 31, 2017 at 3:12 AM, Yair Darshan <YDarshan@xxxxxxxxxxxxx> wrote:

Hi all,

Please review the remedy for this topic.

 

It handles the following:

1)      Preventing to be stuck in ENTRY_SEC when detection in primary has failed or tdet_timer_pri is done when transitioning from ENTRY_SEC to

START_DETECT_SEC.

2)      The transition from IDLE_SEC to START_DETECT_SEC when CC_DET_SEQ=3 is not fully covered for the staggered detection timing range.

3)      Both (1and 2) prevents doing cycles of detection and classifications until host decides to power on the port.

 

Ill appreciate your inputs.

Regards

 

Yair

 

Darshan Yair

Chief R&D Engineer

Analog Mixed Signal Group

Microsemi Corporation

 

1 Hanagar St., P.O. Box 7220
Neve Ne'eman Industrial Zone
Hod Hasharon 45421, Israel
Tel:  +972-9-775-5100, EXT 210.

Cell: +972-54-4893019
Fax: +972-9-775-5111

 

E-mail: <mailto:ydarshan@xxxxxxxxxxxxx>.  

 

 




--
Heath Stewart
Design Center Manager, Mixed Signal

Office   (805) 560-7658
Mobile  (805) 895-0499
Websites      analog.com, linear.com

Linear Technology is now part of Analog Devices.  Learn more.

Inline image 2