Thread Links Date Links
Thread Prev Thread Next Thread Index Date Prev Date Next Date Index

[802.3_EXTND_EPON] FW: [STDS-802-3] IEEE P802.3bk Extended Ethernet Passive Optical Networks 1st Sponsor recirculation ballot updated results



Dear colleagues, 

I am forwarding this email to the P802.3bk reflector just in case you have
not seen it. We have now 100% approval on the last D3.1 draft and it will be
forwarded by the WG Chair for EC approval for pre-submission to RevCom for
consideration at the August meeting. 

Regards

Marek

-----Original Message-----
From: Law, David [mailto:dlaw@xxxxxx] 
Sent: Wednesday, July 10, 2013 7:27 PM
To: STDS-802-3@xxxxxxxxxxxxxxxxx
Subject: [STDS-802-3] IEEE P802.3bk Extended Ethernet Passive Optical
Networks 1st Sponsor recirculation ballot updated results

Dear Colleagues,

I wanted to update you on the ballot results of the 1st Sponsor
recirculation ballot on the Amendment IEEE P802.3bk Extended Ethernet
Passive Optical Networks. We received a ballot flip from the final
disapprove voter after the close of ballot. As a result of this the ballot
statistics are now:

  81 Voters
  62 Approve
   0 Disapprove 
   5 Abstain
  67 Ballots returned

  82.72% Response Rate (>= 75% required)
   7.46% Abstain Rate (< 30% required)
 100.00% Approval Rate (>= 75% required)

Based on the above results, and after consultation with the IEEE P802.3bk
Task Force Chair on the proposed responses to the four editorial comments
submitted <http://www.ieee802.org/3/bk/comments/8023bk_D31_proposed.pdf>, I
will be seeking the approval of the IEEE 802 Sponsor Chair to pre-submit
IEEE P802.3bk/D3.1 to RevCom to meet the submittal deadline of 12th July
2013 for the August 2013 RevCom meeting. This submission however will
require all the normal approvals at the IEEE 802 plenary next week. Hence I
will request this pre-submission to RevCom on the basis that should it be
determined that the IEEE 802.3bk draft requires a recirculation, or should
the submission to this RevCom meeting not be approved, I will remove IEEE
P802.3bk/D3.1 from the August 2013 RevCom agenda.
 
Best regards,
  David

-----Original Message-----

From: Law, David
Sent: 19 June 2013 20:41
To: IEEE 802.3 Working Group <stds-802-3@xxxxxxxx>
Subject: IEEE P802.3bk Extended Ethernet Passive Optical Networks 1st
Sponsor recirculation ballot results

Dear Colleagues,

The 1st Sponsor recirculation ballot on the Amendment IEEE P802.3bk Extended
Ethernet Passive Optical Networks closed successfully on 18th June 2013. The
ballot exceeded the required 75% for consensus to approve the draft. The
July 2013 IEEE P802.3bk Task Force plenary week meeting
<http://www.ieee802.org/3/interims/index.html> will consider the 4 comments
submitted and determine changes to the draft as appropriate. The
availability of the comment database will be announced on the IEEE P802.3bk
Task Force reflector.

The ballot statistics are:

  81 Voters
  61 Approve
   1 Disapprove 
   5 Abstain
  67 Ballots returned

  82.72% Response Rate (>= 75% required)
   7.46% Abstain Rate (< 30% required)
  98.39% Approval Rate (>= 75% required)

Thank you to all that participated in this ballot. 

David Law
Chair, IEEE 802.3 Ethernet Working Group

Marek Hajduczenia
Chair, IEEE P802.3bk Extended Ethernet Passive Optical Networks Task Force