Thread Links Date Links
Thread Prev Thread Next Thread Index Date Prev Date Next Date Index

Re: [802.3_RTPGE] Announcement - D1.5 Task Force Review: IEEE P802.3bp



Dear colleagues, 

All received comments were posted at:
http://www.ieee802.org/3/bp/comments/8023bp_D15_received.pdf, and the
proposed responses to all received comments are posted at:
http://www.ieee802.org/3/bp/comments/8023bp_D15_proposed.pdf. 

We received the grand total of 58 comments, (E, ER: 28, T, TR: 30) with
majority of them addressing issues in Clause 45 and Clause 97. 

Regards

Marek

-----Original Message-----
From: Steven B. Carlson [mailto:scarlson@xxxxxxxxxxxxx] 
Sent: Monday, June 15, 2015 2:45 PM
To: STDS-802-3-RTPGE@xxxxxxxxxxxxxxxxx
Subject: [802.3_RTPGE] Announcement - D1.5 Task Force Review: IEEE P802.3bp

Dear Colleagues:

This is the announcement of the review of the IEEE P802.3bp 1000BASE-T1 Task
Force draft amendment D1.5.  Instructions for accessing the draft and
submitting comments follow this announcement.
 
IEEE P802.3bp is an amendment to IEEE Std 802.3-2012 which is available
through the "Get 802" program at the URL:
http://standards.ieee.org/getieee802/802.3.html
 
The Project Authorization Request for this amendment is posted at:
http://www.ieee802.org/3/bp/P802.3bp_12_Jun_14.pdf
 
The Five Criteria Responses for this amendment are posted at:
http://www.ieee802.org/3/bp/5Criteria.pdf
 
The Objectives for this amendment are posted at:
http://www.ieee802.org/3/bp/Updated_Objectives_0714.pdf
 
___________________________________________
 
REVIEW SCOPE:
The scope of the review is the changes made from  D1.4 to D1.5 Draft.
 
REVIEW OPEN:
Tuesday, 15 June 2015
REVIEW CLOSE:
Monday 29 June 2015 11:59pm AOE

Comment resolution will take place at the July Plenary. This review should
focus on the changes made from D1.4 to D1.5. Since D1.5 will be the Working
Group preview draft, the Task Force will need to carefully consider any
changes made to the draft at the July plenary, and whether they are
important enough to create a D1.6.  If D1.6 is created, all redlined changes
will need to be presented to the WG at the closing plenary.
 
-------------------------------------------------------------------------
HOW TO ACCESS THE DRAFT
The draft is posted for Task Force review purposes only, and neither the
draft nor access information should be copied or redistributed to others in
violation of document copyrights.
 
Draft 1.5 (clean) should be used for commenting and may be downloaded from:
http://www.ieee802.org/3/bp/private/Sources/P8023bp%20D1.5.pdf

Username and password: distributed at meetings
 
The document is posted in Adobe "pdf" document format and can be downloaded
and printed if desired. If you do not have Adobe Acrobat Reader, it is
available for free downloading from Adobe at:
URL: http://www.adobe.com/prodindex/acrobat/readstep.html
 
_______________________________________
HOW TO SUBMIT COMMENTS
 
Acceptable comment types:
 
E = Editorial
ER = Editorial Required (an Editorial comment that the commenter feels very
strongly about) T = Technical TR = Technical Required (a Technical comment
that the commenter feels very strongly about)
 
For further information regarding comments, please see
http://www.ieee802.org/3/bj/public/may12/diab_01_0512.pdf
 
1. Prepare your comments in one of the following two ways:
 
a. You are STRONGLY REQUESTED to use the comment tool in the TF private area
at the URL:
 
URL: http://ieee802.org/3/WG_tools/filemaker/index.html

Please download and read the Comment Tool Tutorial:
http://www.ieee802.org/3/bj/public/may12/diab_01_0512.pdf
 
To use the tool, extract all components into a folder and do not move any
component from that folder as this will cause the executable to not work
correctly. The tool is:
 
Comment_Tool_Generic_Solution.exe

The comment tool runs under Microsoft Windows. It has also been run in
Windows VM environments on other platforms.
 
b. To submit comments in text (ASCII) form, please use the form below.  This
will make it possible for the editor to properly record and track all
submissions. Make as many copies of the template as necessary and submit as
an ASCII text file or as part of your e-mail.
 
PLEASE NOTE: The ASCII method involves a manual transcription, hence you are
recommended to check your comments to ensure accurate transcription when the
comment file is made available. Please use the comment tool above if
possible.
 
------CUT AND PASTE TEXT BELOW THIS LINE ONLY PLEASE--------
 
CommentID: (Leave Blank)
CommenterName:
CommenterEmail:
CommenterPhone:
CommenterCellPhone:
CommenterCompany:
Clause:
Subclause:
Page:
Line:
CommentType: (E, ER, T, or TR)
Comment:
CommentEnd:
SuggestedRemedy:
RemedyEnd:
 
--------------------end comment template------------------
 
2. Send your comments to: Marek.Hajduczenia@xxxxxxxxxxxxxxxxx , CC
scarlson@xxxxxxxx and paste into the subject line:
 
IEEE P802.3bp 1000BASE-T1 Task Force D1.5 comments
 
_____________________________________________________________
 
Thank you for your participation in this careful review of the draft.
 
Marek Hajduczenia, PhD
Network Architect, Principal Engineer
Bright House Networks
Chief Editor, IEEE P802.3bp Task Force 
 

Steven B. Carlson
Chair, IEEE P802.3bp 1000BASE-T1 PHY Task Force
http://www.ieee802.org/3/bp/index.html
Executive Secretary, IEEE 802.3 Working Group
http://grouper.ieee.org/groups/802/3/index.html
President
High Speed Design, Inc.
Portland, OR
scarlson@xxxxxxxxxxxxx