Thread Links Date Links
Thread Prev Thread Next Thread Index Date Prev Date Next Date Index

[802.3_10SPE] New drafts, comment response reports, and opening of first recirculation ballot



All – The website has been updated with the following files:

In the private area:

Draft 3.1 of IEEE P802.3cg, responding to the comments on our initial sponsor ballot

A compare draft of 3.1 to 3.0 showing the substantive changes from d 3.0 to d 3.1 which are being recirculated with the ballot

A link to the report of comments not satisfied as of 6/6/19 (see below).

 

In the public “comments” area:

Final comment reports on the initial sponsor ballot (dated 5/27/19 – apologies for the delay in posting), aligned to revcom guidelines.

(along with a report of the alignments made according to the motion in Salt Lake)

These are in the usual pdf format with multiple sorts, and the Excel spreadsheet format for reference.

 

A report of the comments not satisfied (that is, unsatisified and unclosed with the commenter) from the initial sponsor ballot.

 

You should have seen the ballot announcement, and the chair’s standard offer for those not in the ballot pool.  The ballot closes 21 June 2019.

If you are submitting under the Chair’s standard offer, PLEASE get your comments in earlier (by the 19th at the latest).  June is a very busy month for many of us.

 

George Zimmerman, Ph.D.

President & Principal

CME Consulting, Inc.

Experts in Advanced PHYsical Communications

george@xxxxxxxxxxxxxxxxxxxx

310-920-3860

 


To unsubscribe from the STDS-802-3-10SPE list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-3-10SPE&A=1