General Information |
|||
| Agenda | 11-Mar-2019 | Beth Kochuparambil | Cisco |
| Minutes | 28-Mar-2019 | Kent Lusted | Intel |
Liaison Letters |
Contributed Presentations - In presentation order. |
|||
| Editorial Considerations | 7-Mar-2019 | Matt Brown | MACOM |
| POSSIBLE TO INSERT CHRIS DIMINICO'S LATE PRESENTATION | See below | Chris Diminico | MC Communications |
| QSFP-DD 2m Cable Channels | 12-Mar-2019 | Tom Palkert | Molex |
| 100G OSFP Cable Assemblies | 12-Mar-2019 | Nathan Tracy | TE Connectivity |
| Considerations for the Minimum COM Limit | 7-Mar-2019 | Adam Healey | Broadcom |
| 100GEL C2M Channel Model Study Update | 7-Mar-2019 | Hiroaki Kukita | Yamaichi |
| 100G C2M Channel Model Update | 7-Mar-2019 | Jane Lim Arturo Pachon Pirooz Tooyserkani |
Cisco |
| Draft Baseline Proposal for 100GAUI-1/200GAUI-2/400GAUI-4 C2M | 7-Mar-2019 | Junqing (Phil) Sun Adam Healey Matt Brown Rich Mellitz Piers Dawe Yasuo Hidaka |
Credo Broadcom Macom Samtec Mellanox Credo |
| Baseline Proposal for "100 Gb/s, 200 Gb/s, and 400 Gb/s Chip-to-Module Attachment Unit Interface | 12-Mar-2019 | Mike Li Jane Lim Ali Ghiasi Karthik Gopalakrishnan Ilya Lyubomirsky Piers Dawe Ed Frlan Mark Kimber |
Intel Cisco Ghiasi Quantum Inphi Inphi Mllanox Semtech Semtech |
| 100GE/200GE/400GE C2M Simulation Update | 7-Mar-2019 | Phil Sun | Credo |
| C2M Simulation | 12-Mar-2019 | Ali Ghiasi | Ghiasi Quantum |
| POSSIBLE TO INSERT MIKE LI'S LATE PRESENTATION | See below | Mike Li Hsinho Wu Masashi Shimanouchi |
Intel |
| ERL Feature Additions Required for C2M in COM 2.60 | 7-Mar-2019 | Richard Mellitz | Samtec |
| Exploring System Noise for Usage in COM | 7-Mar-2019 | Richard Mellitz | Samtec |
| Baseline Proposal for 100, 200 and 400 Gb/s Backplane | 7-Mar-2019 | Howard Heck | Intel Corporation |
| COM Parameters Proposal for KR | 13-Mar-2019 | Mau-Lin Wu Pei-Rong Li Yuan-Hao Tung |
MediaTek |
| Ethernet 106 Gb/s ERL Studies | 7-Mar-2019 | Mike Li Masashi Shimanouchi Hsinho Wu |
Intel |
| Floating Tap Benefit for Backplane Channels | 7-Mar-2019 | Howard Heck Subas Bastola Jingbo Li Cesar Mendez-Ruiz Femi Akinwale |
Intel Corporation |
| Analysis of Potential Solutions for 100G CR/KR DFE Error Propagation | 7-Mar-2019 | Yuchun Lu Yan Zhuang |
Huawei |
| Error Statistics Analysis on 802.3ck Channels | 13-Mar-2019 | Xiang He | Huawei |
| RS(544,514) FEC performance for RR/CR 100G and 400G | 7-Mar-2019 | Pete Anslow | Ciena |
| New Insights on DFE Burst Error Impact for 100G KR/CR FEC | 7-Mar-2019 | Ilya Lyubomirsky Jamal Riani Sudeep Bhoja |
Inphi |
| Error Statistics and 100GE FEC Schemes | 7-Mar-2019 | Phil Sun | Credo |
| Elimination of DFE Error Propagation and Post-FEC Error Floor (Precoding 2.0) | 7-Mar-2019 | Yuchun Lu Liang Li Lin Ma Yan Zhuang |
Huawei |
| Correlation of On-Die Termination to C_d Value in COM Model | 7-Mar-2019 | Mau-Lin Wu Ehung Chen Tamer Ali |
MediaTek |
| Correlating COM’s Excessive Capacitance C_Die Value to Measurements | 20-Mar-2019 | Liav Ben-Artsi | Marvell |
Late Contributions |
|||
| 106 Gbps C2M Simulation Updates | 7-Mar-2019 | Mike Li Hsinho Wu Masashi Shimanouchi |
Intel |
| Baseline proposal for copper twinaxial cable specifications | 11-Mar-2019 | Chris DiMinico | MC Communications |
| PCS, FEC, and PMA sublayer Baseline Proposal | 13-Mar-2019 | Mark Gustlin Gary Nicholl Dave Ofelt Jeff Slavick |
Cisco Cisco Juniper Broadcom |
| IEEE 802.3ck C2M Baseline Proposal (after edits from the floor) | 13-Mar-2019 | Phil Sun Mike Li |
Credo Intel |
| Baseline Proposal for 100, 200, and 400 Gb/s Backplane (Update) (after edits from the floor) | 13-Mar-2019 | Howard Heck Mike Li Mau-Lin Wu Phil Sun |
Intel Intel MediaTek Credo |
| Thoughts on CR Loss Budget | 13-Mar-2019 | Piers Dawe | Mellanox |
|
|
|
|