Agenda and General Information 14-Aug-19 (85k) |
John D'Ambrosia | Futurewei, US Subsidiary of Huawei |
Unapproved Minutes 15-Aug-19 (138k) |
John D'Ambrosia | Futurewei, US Subsidiary of Huawei |
Summary Splitting IEEE P802.3ct Project - Proposed Project
Documentation Packages 14-Aug (169k) |
John D'Ambrosia | Futurewei, US Subsidiary of Huawei |
Proposed Draft PAR Responses:
100 GbE over DWDM PHY Objectives 14-Aug (127k) |
John D'Ambrosia | Futurewei, US Subsidiary of Huawei |
Proposed CSD Responses: 100 GbE
over DWDM Project (IEEE P802.3ct) Objectives 14-Aug (255k) |
John D'Ambrosia | Futurewei, US Subsidiary of Huawei |
Draft PAR Responses: 400 GbE
over DWDM PHY Objectives Proposed IEEE 802.3cw Project 14-Aug (126k) |
John D'Ambrosia | Futurewei, US Subsidiary of Huawei |
Proposed CSD Responses: 400 GbE
over DWDM Project (IEEE P802.3cw) Objectives 14-Aug (256k) |
John D'Ambrosia | Futurewei, US Subsidiary of Huawei |
Return to the IEEE P802.3cn / P802.3ct Interim
Meeting Teleconference Page
Last Update: 14-Aug-2019