Agenda and General Information 23-Apr-20 (597k) |
John D'Ambrosia | Futurewei, US Subsidiary of Huawei |
Approved Minutes 07-May-20 (124k) |
John D'Ambrosia | Futurewei, US Subsidiary of Huawei |
Baseline Proposal: 400GBASE-ZR
operation on 75GHz grid 22-Apr-20 (1.3M) |
Mike Sluyski | Acacia Communications |
Inter-Channel Crosstalk Requirement
for 75 GHz-spaced 400GBASE-ZR 22-Apr-20 (935k) |
W. Way Y. Weng |
NeoPhotonics |
Late Presentation |
||
Updated parameter template for
400GBASE-ZR 22-Apr-20 (35k) |
Peter Stassar | Huawei |
Return to the IEEE P802.3cw Interim
Teleconference Meetings Page
Last Update:
07-May 2020