Move to approve resolutions to the CIDs:
and incorporate the text changes into the latest TGbn draft.
Move: Second:
Discussion:
Result:
Note: Motioned earlier but the instructions to editor incorrectly pointed to r0 as opposed to r8.
Hi Alfred,
Could you please add the following to the motion list? This is a simple editorial revision requested by the editor.
- Move to incorporate the proposed text for CID 2697 provided in 11-25/0757r08 to the latest TGbn draft, which the following revision:
TGbn editor, please incorporate changes tagged with 2697 in 11-25/0757r
08.
Many thanks,
-Salvatore (Nokia)
From: Alice Jialing Li Chen <jialing.li.phd2@xxxxxxxxx>
Sent: Wednesday, May 21, 2025 2:18 PM
To: STDS-802-11-TGBN@xxxxxxxxxxxxxxxxx
Subject: Re: [STDS-802-11-TGBN] TGbn Motion & SP request
CAUTION: This is an external email. Please be very careful when clicking links or opening attachments. See the URL nok.it/ext for additional information.
Hi Alfred,
Could you add the following passed SPs to the motion list? Thanks. Note that M1 below and the passed motion 433 were from the same passed SP before. We removed the sub-bullet on the interference mitigation when we ran motion 433.
M1: Move to add the following to 11bn SFD
– Use fixed value for the following field in the CoBF transmission
• Interference Mitigation is fixed to ‘Disable’
• Supporting doc: 11-25/842r1, 11-25/389r2, 11-25/399r1, 11-25/401r0
No objection
• M2: Move to add the following to 11bn SFD
– The Bandwidth and Punctured Channel Information indication in the CoBF Invite and Sync frames are the same with the following rules:
• When the static puncturing patterns of the two APs are the same, the puncturing information in the invite and sync frames corresponds to that
• If the static puncturing patterns of the two APs are not the same, the sharing AP will need to reduce to a smaller BW in which the two APs have the same puncturing pattern, and the information in the invite and sync frames will correspond to that reduced BW configuration
• Note: Indication format is TBD
• Supporting doc: 11-25/842r1
No objection
• M3: Move to add the following to 11bn SFD
– The indicated GI+LTF Size (for the COBF transmission) in the CoBF Invite and Sync frames is the same
• GI+LTF size indication format is TBD
• Supporting doc: 11-25/842r1
190Y/26N/82A
• M4: Move to add the following to 11bn SFD
– The Number of UHR-SIG Symbols in CoBF transmission is equal to the minimum number of UHR-SIG symbols needed to accommodate the UHR-SIG information
• No extra UHR-SIG symbols will be allowed
• Supporting doc: 11-25/842r1
No objection
Regards,
Alice
On Thu, May 15, 2025 at 7:27 AM Alice Jialing Li Chen <jialing.li.phd2@xxxxxxxxx> wrote:
Hi Alfred,
Could you please add the following passed SP to motion?
• M4: Move to add the following to 11bn SFD
– The Number of UHR-SIG Symbols in CoBF transmission is equal to the minimum number of UHR-SIG symbols needed to accommodate the UHR-SIG information
• No extra UHR-SIG symbols will be allowed
• Supporting doc: 11-25/842r1
No objection
Regards,
Alice
On Thu, May 15, 2025 at 3:10 AM Alice Jialing Li Chen <jialing.li.phd2@xxxxxxxxx> wrote:
Hi Alfred,
Could you please add the following passed SPs to the PM2 motion list?
• M1: Move to add the following to 11bn SFD
– Use fixed values for the following fields in the CoBF transmission
• UHR-SIG MCS is fixed to MCS0
• Spatial Reuse is fixed to ‘PSR_AND_NON_SRG_OBSS_PD_PROHIBITED’
• LDPC Extra Symbol Segment is fixed to 1
• PE Disambiguity is fixed to 1
• Interference Mitigation is fixed to ‘Disable’
• Supporting doc: 11-25/842r1, 11-25/389r2, 11-25/399r1, 11-25/401r0
No objection
• M2: Move to add the following to 11bn SFD
– The Bandwidth and Punctured Channel Information indication in the CoBF Invite and Sync frames are the same with the following rules:
• When the static puncturing patterns of the two APs are the same, the puncturing information in the invite and sync frames corresponds to that
• If the static puncturing patterns of the two APs are not the same, the sharing AP will need to reduce to a smaller BW in which the two APs have the same puncturing pattern, and the information in the invite and sync frames will correspond to that reduced BW configuration
• Note: Indication format is TBD
• Supporting doc: 11-25/842r1
No objection
• M3: Move to add the following to 11bn SFD
– The indicated GI+LTF Size (for the COBF transmission) in the CoBF Invite and Sync frames is the same
• GI+LTF size indication format is TBD
• Supporting doc: 11-25/842r1
119Y/26N/82A
Could you please add the following SP to the PM2 session?
• SP4: Do you agree to add the following to 11bn SFD?
– The Number of UHR-SIG Symbols in CoBF transmission is equal to the minimum number of UHR-SIG symbols needed to accommodate the UHR-SIG information
• No extra UHR-SIG symbols will be allowed
• Supporting doc: 11-25/842r1
Regards,
Alice
On Thu, May 15, 2025 at 1:13 AM Alice Jialing Li Chen <jialing.li.phd2@xxxxxxxxx> wrote:
Hi Alfred,
I presented 11-25/842r0 in the last TGbn PHY call in the May Interim. No time to run 4 SPs in the PHY call. Just uploaded the latest 11-25/842r1. May I run the following SPs in the Joint call if time permits?
• SP1: Do you agree to add the following to 11bn SFD?
– Use fixed values for the following fields in the CoBF transmission
• UHR-SIG MCS is fixed to MCS0
• Spatial Reuse is fixed to ‘PSR_AND_NON_SRG_OBSS_PD_PROHIBITED’
• LDPC Extra Symbol Segment is fixed to 1
• PE Disambiguity is fixed to 1
• Interference Mitigation is fixed to ‘Disable’
• Supporting doc: 11-25/842r1, 11-25/389r2, 11-25/399r1, 11-25/401r0
• SP2: Do you agree to add the following to 11bn SFD?
– The Bandwidth and Punctured Channel Information indication in the CoBF Invite and Sync frames are the same with the following rules:
• When the static puncturing patterns of the two APs are the same, the puncturing information in the invite and sync frames corresponds to that
• If the static puncturing patterns of the two APs are not the same, the sharing AP will need to reduce to a smaller BW in which the two APs have the same puncturing pattern, and the information in the invite and sync frames will correspond to that reduced BW configuration
• Note: Indication format is TBD
• Supporting doc: 11-25/842r1
• SP3: Do you agree to add the following to 11bn SFD?
– The indicated GI+LTF Size (for the COBF transmission) in the CoBF Invite and Sync frames is the same
• GI+LTF size indication format is TBD
• Supporting doc: 11-25/842r1
• SP4: Do you agree to add the following to 11bn SFD?
– The Number of UHR-SIG Symbols in CoBF transmission is equal to the minimum number of UHR-SIG symbols needed to accommodate the UHR-SIG information
• No extra UHR-SIG symbols will be allowed
• Supporting doc: 11-25/842r1
Regards,
Alice Chen
Qualcomm
To unsubscribe from the STDS-802-11-TGBN list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-11-TGBN&A=1
To unsubscribe from the STDS-802-11-TGBN list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-11-TGBN&A=1
To unsubscribe from the STDS-802-11-TGBN list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-11-TGBN&A=1