| Thread Links | Date Links | ||||
|---|---|---|---|---|---|
| Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
|
Greetings everyone, This is to start discussion thread on P-EDCA 97us. I encourage everyone interested in P-EDCA topic to use this thread to provide comments and share opinion on a problem. Quick summary: Four options presented, option 4 is proposed as a solution. The document 0210 describe pros/cons of options 1-3.
Contribution 0210r2: https://mentor.ieee.org/802.11/dcn/26/11-26-0210-02-00bn-lb291-cr-p-edca-part4.docx Again, comments/suggestions are highly appreciated Dmitry To unsubscribe from the STDS-802-11-TGBN list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-11-TGBN&A=1 |