Thread Links Date Links
Thread Prev Thread Next Thread Index Date Prev Date Next Date Index

[STDS-802-11-TGBN] Further Discussion on 26/302



Hi CoBF/CoSR PoCs and TTTs,

 

Thanks for the feedback you all provided on 26/302. I wanted to initiate this thread to summarize the feedback and explore possible ways forward.

 

In this CR document, we proposed a signaling scheme to help eMLSR/DPS STAs switch back to listen/LC mode earlier at the end of CoBF/CoSR TXOPs. The main idea was to achieve this using a baseline scheme/frame with minimal changes to the current spec.

 

The proposed scheme can be summarized in 3 points:

  • The coordinating AP shall transmit a CF-End frame to end the CoBF sequence.
  • The coordinated AP may transmit a CF-End frame following that of the coordinating AP.
  • The non-AP STA may switch back immediately once receiving any of the CF-End frames.

 

The majority of feedback I received can be summarized under two directions:

  • Some members recommended stronger language on the coordinated AP à Use a “shall” condition.
  • Some members recommended softer language on the coordinating AP à Use a “should” condition.

 

As it is clear, the recommendations are conflicting, hence I suggest that we find a middle ground where it is mandated with a “shall” on the coordinating AP while keeping the flexibility on the coordinated AP with a “may”.

 

 

Please let me know your thoughts.

 

Regards,

Sherief


To unsubscribe from the STDS-802-11-TGBN list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-11-TGBN&A=1

Attachment: image001.emz
Description: image001.emz

Attachment: oledata.mso
Description: oledata.mso