| Thread Links | Date Links | ||||
|---|---|---|---|---|---|
| Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
|
Gentle reminder - @TTT
members for enhanced critical updates feature
From: Abhishek Patil <appatil@xxxxxxxxxxxxxxxx>
Sent: Wednesday, October 28, 2026 12:28 AM To: STDS-802-11-TGBN@xxxxxxxxxxxxxxxxx <stds-802-11-tgbn@xxxxxxxxxxxxxxxxx> Subject: UHR eCU: table showing when & where to carry the UHR Parameters Update element
Hi TTT members for enhanced critical updates feature,
Based on several requests and some offline discussions, I have prepared the following two tables that show the expected behavior at the AP side during different phases of an on-going critical updates procedure.
The first table shows when & where the UHR Parameters Updates element is included within various mgmt. frames of a UHR AP while an eCU procedure is on-going.
The second table shows the inclusion of CU information in PVB of TIM element at different times.
* “Any AP affiliated with the same AP MLD as the affected AP” includes the affected AP itself. The affected AP may correspond to the transmitted BSSID of a multiple BSSID set, in which case there is a single TIM element for the entire set, and a critical update
at any nontransmitted BSSID of that set (if applicable) is reflected in that single TIM element.
I will be including these tables in an upcoming CR doc. Sharing it beforehand to solicit any suggestions/feedback.
Regards,
Abhi
To unsubscribe from the STDS-802-11-TGBN list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-11-TGBN&A=1 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||