Hi Eunsung,

 

        Thanks your work. I have some comments for SP1 as follows.

1)     for transmit beam establishment, containing multiple sounding signal or TRN subfiles within one PPDU may raise the issue that how to configure the transmit beam for preamble part. It would probably reduce the beam detect performance.

2)     For sounding signal or TRN subfield, we had better check whether put “e.g., LTF” in the SP Now,

as we know that there may exist two different LTF types, and STF can also be used for beam measure.

 

BR

Jiqing Ni

OPPO

 

发件人: Eunsung Park <esung.park@xxxxxxx>
发送时间: 2026115 8:46
收件人: STDS-802-11-TGBQ@xxxxxxxxxxxxxxxxx
主题: Re: [STDS-802-11-TGBQ] SPs for beam training and NDP

 

外部邮件/External Mail

 

Hi Qinghua,

 

Thanks very much for the feedback. Regarding SP2-3 (25/1535r1 Discussion on BFT Types for 11bq), I got your point. Then, how about changing the text as below?

  • Do you support to include the following into the 11bq SFD?
    • 11bq defines transmit and receive beam establishment procedures
      • For transmit beam establishment where an IMMW STA determines its own transmit antenna settings, the STA transmits sounding signals (e.g., LTF) using different transmit beam directions to its peer STA
      • For receive beam establishment where an IMMW STA determines its own receive antenna settings, the STA receives sounding signals (e.g., LTF) using different receive beam directions from its peer STA
      • The number of sounding signals contained in a PPDU used for transmit or receive beam establishment is TBD
      • Terminologies can be changed
      • Detailed procedures are TBD

 

I will defer SP2 (25/1914r1 PPDU for Sector Level Sweep in 11bq) and lets have a further discussion.

 

Best regards,

Eunsung

 

From: Li, Qinghua <qinghua.li@xxxxxxxxx>
Sent: Thursday, January 15, 2026 5:26 AM
To: STDS-802-11-TGBQ@xxxxxxxxxxxxxxxxx
Subject: Re: [STDS-802-11-TGBQ] SPs for beam training and NDP

 

Hi Eunsung,

 

Thanks for the SPs and related contributions.  I have some comments below.  I would like to ask for deferrals of two SPs and hope to have more discussions.  

SP2-3 (25/1535r1 Discussion on BFT Types for 11bq)

  • Do you support to include the following into the 11bq SFD?
    • 11bq defines transmit and receive beam establishment procedures
      • For transmit beam establishment where an IMMW STA determines its own transmit antenna settings, the STA transmits PPDUs using different transmit beam directions to its peer STA
      • For receive beam establishment where an IMMW STA determines its own receive antenna settings, the STA receives PPDUs using different receive beam directions from its peer STA
      • Terminologies can be changed
      • Detailed procedures are TBD

[QL] Suggest to defer the SP. The sounding signal for evaluating beams/sectors has not been evaluated and discussed. The sounding PPDU is just the carrier of the sounding signal(s). It is feasible that one PPDU with multiple sounding signals for multiple beams/sectors is defined for 11bq. It is desired to have more time for discussions.  

SP2 (25/1914r1 PPDU for Sector Level Sweep in 11bq)

  • Do you support to include the following into the 11bq SFD?
    • The smallest bandwidth is applied to PPDUs transmitted for the beam establishment in a mmWave band

[QL] Suggest to defer the SP. The best beam/sector that is selected from 320MHz and 640MHz sounding for the same channel may be different. It would be helpful to have some evaluations showing the sector/beam selection is accurate enough using 320 MHz for 640 MHz.

 

Thanks,

Qinghua

 

 

From: Eunsung Park <esung.park@xxxxxxx>
Sent: Wednesday, January 14, 2026 8:14 AM
To: STDS-802-11-TGBQ@xxxxxxxxxxxxxxxxx
Subject: [STDS-802-11-TGBQ] SPs for beam training and NDP

 

Hi all,

 

I am supposed to run four SPs on Thursday PM1 as follows. They are from my previous contributions regarding beam training (25/1535r1) and NDP (25/1914r1). Before running them I would like to get some feedback. I would be grateful if you could review them and share your thoughts. Any comments and questions are welcome.

 

Best regards,

Eunsung

 

 

SP2-3 (25/1535r1 Discussion on BFT Types for 11bq)

  • Do you support to include the following into the 11bq SFD?
    • 11bq defines transmit and receive beam establishment procedures
      • For transmit beam establishment where an IMMW STA determines its own transmit antenna settings, the STA transmits PPDUs using different transmit beam directions to its peer STA
      • For receive beam establishment where an IMMW STA determines its own receive antenna settings, the STA receives PPDUs using different receive beam directions from its peer STA
      • Terminologies can be changed
      • Detailed procedures are TBD

 

SP5-1 (25/1535r1 Discussion on BFT Types for 11bq)

  • Do you support to include the following into the 11bq SFD?
    • 11bq defines transmit and receive beam tracking procedures
      • For transmit beam tracking where an IMMW STA optimizes its own transmit antenna settings after beam establishment, the STA transmits a PPDU containing a transmit beam tracking field (e.g., TRN-T) to its peer STA
      • For receive beam tracking where an IMMW STA optimizes its own receive antenna settings after beam establishment, the STA receives a PPDU containing a receive beam tracking field (e.g., TRN-R) from its peer STA
      • Terminologies can be changed
      • Details for transmit and receive beam tracking fields are TBD
      • Detailed procedures are TBD

 

SP1 (25/1914r1 PPDU for Sector Level Sweep in 11bq)

  • Do you support to include the following into the 11bq SFD?
    • NDP like PPDU is used for the beam establishment in a mmWave band
      • This PPDU consists of STF, LTF and SIG(s) and there is no Data field
      • Other fields (e.g., additional STF and LTF, PE, TRN) are TBD
      • Details on the PPDU structure are TBD

 

SP2 (25/1914r1 PPDU for Sector Level Sweep in 11bq)

  • Do you support to include the following into the 11bq SFD?
    • The smallest bandwidth is applied to PPDUs transmitted for the beam establishment in a mmWave band

 


To unsubscribe from the STDS-802-11-TGBQ list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-11-TGBQ&A=1


To unsubscribe from the STDS-802-11-TGBQ list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-11-TGBQ&A=1


To unsubscribe from the STDS-802-11-TGBQ list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-11-TGBQ&A=1


OPPO

本电子邮件及其附件含有OPPO公司的保密信息,仅限于邮件指明的收件人(包含个人及群组)使用。禁止任何人在未经授权的情况下以任何形式使用。如果您错收了本邮件,切勿传播、分发、复制、印刷或使用本邮件之任何部分或其所载之任何内容,并请立即以电子邮件通知发件人并删除本邮件及其附件。
网络通讯固有缺陷可能导致邮件被截留、修改、丢失、破坏或包含计算机病毒等不安全情况,OPPO对此类错误或遗漏而引致之任何损失概不承担责任并保留与本邮件相关之一切权利。

除非明确说明,本邮件及其附件无意作为在任何国家或地区之要约、招揽或承诺,亦无意作为任何交易或合同之正式确认。
发件人、其所属机构或所属机构之关联机构或任何上述机构之股东、董事、高级管理人员、员工或其他任何人(以下称“发件人”或“OPPO”)不因本邮件之误送而放弃其所享之任何权利,亦不对因故意或过失使用该等信息而引发或可能引发的损失承担任何责任。
文化差异披露:因全球文化差异影响,单纯以YES\OK或其他简单词汇的回复并不构成发件人对任何交易或合同之正式确认或接受,请与发件人再次确认以获得明确书面意见。发件人不对任何受文化差异影响而导致故意或错误使用该等信息所造成的任何直接或间接损害承担责任。

This e-mail and its attachments contain confidential information from OPPO, which is intended only for the person or entity whose address is listed above. Any use of the information contained herein in any way (including, but not limited to, total or partial disclosure, reproduction, or dissemination) by persons other than the intended recipient(s) is prohibited. If you are not the intended recipient, please do not read, copy, distribute, or use this information. If you have received this transmission in error, please notify the sender immediately by reply e-mail and then delete this message.

Electronic communications may contain computer viruses or other defects inherently, may not be accurately and/or timely transmitted to other systems, or may be intercepted, modified ,delayed, deleted or interfered. OPPO shall not be liable for any damages that arise or may arise from such matter and reserves all rights in connection with the email.

Unless expressly stated, this e-mail and its attachments are provided without any warranty, acceptance or promise of any kind in any country or region, nor constitute a formal confirmation or acceptance of any transaction or contract.
The sender, together with its affiliates or any shareholder, director, officer, employee or any other person of any such institution (hereinafter referred to as "sender" or "OPPO") does not waive any rights and shall not be liable for any damages that arise or may arise from the intentional or negligent use of such information.
Cultural Differences Disclosure: Due to global cultural differences, any reply with only YES\OK or other simple words does not constitute any confirmation or acceptance of any transaction or contract, please confirm with the sender again to ensure clear opinion in written form. The sender shall not be responsible for any direct or indirect damages resulting from the intentional or misuse of such information.