| Thread Links | Date Links | ||||
|---|---|---|---|---|---|
| Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
|
Hello Cheng Could you help add me to the TTT list of the below sections? Thank you. 41.2 IMMW BSS operation 41.3 IMMW capabilities and operation 41.4 IMMW SP operation 41.5 IMMW power save 41.6 IMMW P2P 41.7.1 Introduction to IMMW beamforming 41.7.2.1 General beam establishment 41.7.2.2 Broadcast SP for beam measurement 41.7.2.3 Cross link indication of early termination 41.7.3 IMMW beam tracking 41.8 IMMW MIMO operation Best wishes Ming Gan 发件人: Chen, Cheng <cheng.chen@xxxxxxxxx>
Hello TGbq members, Thank you all for the great discussions and teamwork today at the TGbq call for the PoC and TTT assignment ! Really appreciate everyone’s support here. I have uploaded a revised document tracking the PoC/TTT list for all identified MAC/PHY/Joint subclauses so far. Please review it, and if you find something that I missed, feel free to reach out. Note that there are still 3 subclauses where the PoC is TBD, which is highlighted in the document. I would encourage the PoC candidates to have constructive offline discussions to see if we can finalize the PoC list before
the next TGbq call. Again, thank you all for all the good work ! Best, Cheng To unsubscribe from the STDS-802-11-TGBQ list, click the following link:
https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-11-TGBQ&A=1
To unsubscribe from the STDS-802-11-TGBQ list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-11-TGBQ&A=1 |