Thread Links Date Links
Thread Prev Thread Next Thread Index Date Prev Date Next Date Index

[802.3_EFMP] ACTION REQUIRED: Five (5) Day Review of draft PAR P802.3dw and CSD responses



Colleagues,

During the 28May2028 interim meeting of the EFMP study group, the study group completed its work on draft PAR and CSD responses. IEEE 802.3 Working Chair David Law told the study group that, once he and I collaborated to transcribe the PAR responses into the PAR form, a five (5) day review period should be conducted. The study group is tasked with reviewing the attached documents. 

Please look for transcription errors so that we may be confident that our submitted project documents are 100% accurate.  To assist you in the process, I have attached PDF copies of the PAR and CSD responses that the study group approved on 28May2026. Please review the draft CSD responses, CSD_EFMPSG_01b_20260407.pdf. This document will be submitted to the working group. Document PAR_EFMPSG_01c_20260428.pdf is included as a reference you can use to review the submittal document, P802.3dw_PAR_03062026.pdf. 

The review period ends on 09Jun2026 at 6pm CDT (US). Please send your feedback, if any, prior to that deadline. 

Thank you.

Regards,

Bob

Bob Voss
Distinguished Engineer, Panduit Corp
Chairman of the Board, FMP Alliance
Chair, IEEE 802.3 FMP Interop Study Group
Chair, NEMA Limited Energy Systems Section
Principal, NFPA 70 CMP16


To unsubscribe from the STDS-802-3-EFMP list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-3-EFMP&A=1

Attachment: PAR_EFMPSG_01c_20260428.pdf
Description: PAR_EFMPSG_01c_20260428.pdf

Attachment: CSD_EFMPSG_01b_20260407.pdf
Description: CSD_EFMPSG_01b_20260407.pdf

Attachment: P802.3dw_PAR_03062006.pdf
Description: P802.3dw_PAR_03062006.pdf