Thread Links Date Links
Thread Prev Thread Next Thread Index Date Prev Date Next Date Index

Re: objectives list



Dave,
My thoughts are in-line bold-faced.
Cheers,
BJ

At 09:18 AM 08/08/2000 -0600, Dave.Meyer@xxxxxxxxxxxx wrote:

At the last meeting, I signed up to capture working group objectives. Since
I have not seen any yet, I am including some in order to start discussion.

- Define a mechanism to support dual counter rotating rings as one lan
segment
- Support interfaces to 4 physical layer rates
     1GE, 10GE, OC48, OC192

*** needs also include OC12?

- Support Jumbo frame Sizes
- Define a mechanism to support sub 50msec protection switching
- Define a flow control mechanism to dynamically allocate fair bandwidth
- Define a mechanism that simultaneously uses both rings for control and
data
- Define a multicast mechanism
- Support plug and play
- Define a destination stripping mechanism for efficient use of bandwidth
- Meet requirements for 802.1d,q,f

*** Compatibility with 802.1F may not be an issue?  It seems sufficient
     to say RPR will be compatible with SNMP, and IETF defined MIB?