IEEE P802.11 - TASK GROUP BA - GROUP INFORMATION


Status of Project IEEE 802.11ba

Wake-up Radio (WUR) Operation

Minyoung Park, Chair
TBD, Vice-Chair
Leif Wilhelmsson, Recording Secretary


Background

In May 2016, the Wake-up Radio (WUR) Study Group was created within IEEE 802.11 Working Group to develop PAR (project authorization request) and CSD (criteria for standrd development) to enable an energy efficient data reception mode without increase of latency for the 802.11 standard. (See: https://mentor.ieee.org/802.11/dcn/16/11-16-0722-01-0000-proposal-for-wake-up-receiver-study-group.pptx)

The WUR SG completed developing PAR and CSD documents in November 2016. The PAR and CSD was approved by IEEE-SA Standards Board in December 2016. A new task group TGba has been formed in the 802.11 Working Group to develop an amendment titled "Wake-up Radio Operation".


March 2017, Vancouver, BC, Canada

January 2017, Atlanta, Georgia, USA


IEEE 802.11 Wake-up Radio Study Group

November 2016, San Antonio, Texas, USA

September 2016, Warsaw, Poland

July 2016, San Diego, California, USA



USEFUL LINKS TO OTHER SITES:

IEEE P802.11 WLANs RELATED

OTHER SITES


This page is maintained by Minyoung Park. Comments are welcome.

Copyright (c), the Institute of Electrical and Electronics Engineers, Inc. (IEEE).
All rights reserved.
This website may contain names, logos, designs, titles, words, or phrases that may
constitute trademarks, service marks, or tradenames of the IEEE or other entities
which may be registered in certain jurisdictions.