IEEE P802.11 - TASK GROUP BA - GROUP INFORMATION


Status of Project IEEE 802.11ba

Wake-up Radio (WUR) Operation

Minyoung Park, Chair

Yunsong Yang, 1st Vice-Chair

Eunsung Park, 2nd Vice-Chair

Leif Wilhelmsson, Recording Secretary

Po-Kai Huang, Technical Editor


Background

In May 2016, the Wake-up Radio (WUR) Study Group was created within IEEE 802.11 Working Group to develop PAR (project authorization request) and CSD (criteria for standrd development) to enable an energy efficient data reception mode without increase of latency for the 802.11 standard.(See:https://mentor.ieee.org/802.11/dcn/16/11-16-0722-01-0000-proposal-for-wake-up-receiver-study-group.pptx)

The WUR SG completed developing PAR and CSD documents in November 2016. The PAR and CSD was approved by IEEE-SA Standards Board in December 2016. A new task group TGba has been formed in the 802.11 Working Group to develop an amendment titled "Wake-up Radio Operation".


January 2019, St. Louis, Missouri, USA

November 2018, Bangkok, Thailand

September 2018, Waikoloa, HI, USA

July 2018, San Diego, CA, USA

May 2018, Warsaw, Poland

March 2018, Rosemont, Illinois, USA

January 2018, Irvine, California, USA

November 2017, Orlando, Florida, USA

September 2017, Waikoloa, Hawaii, USA

July 2017, Berlin, Germany

May 2017, Daejeon, Korea

       Reviewed technical presentations (33 out of 43 submissions)

o    PHY and MAC

o    Made progress reaching consensus on basic design of PHY/MAC

       Approved TGba Spec Framework Document (SFD): IEEE 802.11-17/575r0

       Reviewed TGba task group documents

o    Usage model document

o    Simulation Scenarios and Evaluation Methodology Document

       Reviewed the TG timeline

       Set goals for the July 2017 meeting and teleconference schedule

       Agenda: see doc.: IEEE 802.11-17/545r11

March 2017, Vancouver, BC, Canada

       TG elected 2 Vice-Chairs

o    1st VC: Yunsong Yang (Huawei): Y/N/A = 62/0/1

o    2nd VC: Eunsung Park (LG Electronics): Y/N/A = 60/0/1

       Reviewed technical presentations (17 out of 35 submissions)

o    Started to reach consensus on high-level technical PHY/MAC concepts

       TGba Spec Framework Document will be created based on the passed motions

o    TG passed 16 technical motions and 2 use case motions 

       Updated TGba task group documents

o    Functional Requirements Document ( IEEE 802.11-17/38r2 )

o    Simulation Scenarios and Evaluation Methodology Document ( IEEE 802.11-17/188r4 )

       Reviewed the TG timeline

       Set goals for the May 2017 meeting and teleconference schedule

       Agenda: see doc.: IEEE 802.11-17/193r7

 

January 2017, Atlanta, Georgia, USA


IEEE 802.11 Wake-up Radio Study Group

November 2016, San Antonio, Texas, USA

September 2016, Warsaw, Poland

July 2016, San Diego, Cal ifornia, USA



USEFUL LINKS TO OTHER SITES:

IEEE P802.11 WLANs RELATED

OTHER SITES


This page is maintained by Minyoung Park. Comments are welcome.

Copyright (c) , the Institute of Electrical and Electronics Engineers, Inc. (IEEE).
All rights reserved.
This website may contain names, logos, designs, titles, words, or phrases that may
constitute trademarks, service marks, or tradenames of the IEEE or other entities
which may be registered in certain jurisdictions.