IEEE 802.3 March 2018 Plenary Minutes

5 to 8 March, 2018
Rosemont, IL, USA



Draft agenda, voter lists and incoming liaisons


Minutes

Unconfirmed Minutes, IEEE 802.3 Ethernet Working Group Plenary, Rosemont, IL, USA, 5 to 8 March, 2018


Administrative attachments

Attachment A1
IEEE 802.3 Opening agenda

Attachment A2
IEEE 802.3 Closing agenda

Attachment A3
IEEE 802.3 Opening report

Attachment A4
IEEE 802.3 Closing report

Attachment A5
IEEE 802.3 Meeting attendance procedures

Attachment A6
IEEE 802.3 Voters list

Attachment A7
IEEE 802.3 Membership list

Attachment A8
IEEE 802.3 Potential voter list

Attachment A9
IEEE 802.3 Voters in peril

Attachment A10
IEEE 802.3 Attendance credit summary, November 2016 to February 2018

Attachment A11
IEEE 802.3 Attendance list Rosemont

Attachment A12
IEEE 802.3 Treasury Report

Attachment A13
IEEE 802.3 Standards status

Attachment A13
IEEE 802.3 Future meetings closing report

Task Force and Study Group attachments

Attachment B1
IEEE 802.3 Maintenance opening report

Attachment B2
IEEE 802.3 Maintenance closing report

Attachment B3
IEEE P802.3bs 200 Gb/s and 400 Gb/s Ethernet Task Force closing report

Attachment B4
IEEE P802.3bt DTE Power via MDI over 4-Pair Task Force opening report

Attachment B5
IEEE P802.3bt DTE Power via MDI over 4-Pair Task Force closing report

Attachment B6
IEEE P802.3ca 25 Gb/s, 50 Gb/s, and 100 Gb/s Ethernet Passive Optical Networks Task Force opening report

Attachment B7
IEEE P802.3ca 25 Gb/s, 50 Gb/s, and 100 Gb/s Ethernet Passive Optical Networks Task Force closing report

Attachment B8
IEEE P802.3cb 2.5 Gb/s and 5 Gb/s Backplane Task Force opening report

Attachment B9
IEEE P802.3cb 2.5 Gb/s and 5 Gb/s Backplane Task Force closing report

Attachment B10
IEEE P802.3cc 25 Gb/s Ethernet over single-mode fiber Task Force closing report

Attachment B11
IEEE P802.3cd 50Gb/s, 100 Gb/s, and 200 Gb/s Ethernet Task Force opening report

Attachment B12
IEEE P802.3cd 50Gb/s, 100 Gb/s, and 200 Gb/s Ethernet Task Force closing report

Attachment B13
IEEE P802.3.2 (IEEE 802.3cf) YANG data models Task Force opening report

Attachment B14
IEEE P802.3.2 (IEEE 802.3cf) YANG data models Task Force closing report

Attachment B15
IEEE P802.3cg 10 Mb/s Single Twisted Pair Ethernet Task Force opening report

Attachment B16
IEEE P802.3cg 10 Mb/s Single Twisted Pair Ethernet Task Force closing report

Attachment B17
IEEE P802.3ch Multi-Gig Automotive Ethernet PHY Task Force opening report

Attachment B18
IEEE P802.3ch Multi-Gig Automotive Ethernet PHY Task Force closing report

Attachment B19
IEEE 802.3 Beyond 10 km optical PHYs Study Group opening report

Attachment B20
IEEE 802.3 Beyond 10 km optical PHYs Study Group closing report

Attachment B21
IEEE 802.3 10 Mb/s Backplane Ethernet Study Group opening report

Attachment B22
IEEE 802.3 10 Mb/s Backplane Ethernet Study Group closing report

Attachment B23
IEEE 802.3 100 Gb/s per Lane Electrical Study Group opening report

Attachment B24
IEEE 802.3 100 Gb/s per Lane Electrical Study Group closing report

Attachment B25
IEEE 802.3 Next-generation 200 Gb/s and 400 Gb/s MMF PHYs Study Group opening report

Attachment B26
IEEE 802.3 Next-generation 200 Gb/s and 400 Gb/s MMF PHYs Study Group closing report

Attachment B27
Industry Connections New Ethernet Applications opening report

Attachment B28
Industry Connections New Ethernet Applications closing report

Attachment B29
Call for interest: Bidirectional 10Gb/s and 25Gb/s optical access PHYs opening report

Attachment B30
Call for interest: Bidirectional 10Gb/s and 25Gb/s optical access PHYs closing report

Liaison Attachments (External and Internal)

Attachment C1
ISO/IEC SC25/WG3 Liaison report to IEEE 802.3

Attachment C2
TIA TR-42 Liaison report to IEEE 802.3


Return to IEEE 802.3 Minutes page
Last Update: 23-Feb 2018


[Search] [e-mail] [Standards Home Page] [Corporate Home Page]