Thread Links Date Links
Thread Prev Thread Next Thread Index Date Prev Date Next Date Index

Re: [STDS-802-11-TGBP] call for PDT SPs and SPs for SFD



Hi Bo,

 

Please add the following SPs for SFD:

 

SP 1

  • Do you agree to add the following text to TG bp SFD?
    • 11bp shall adopt the following channelization scheme for EU:
      • Bands: 865-868MHz
      • BW: 200kHz
      • Channel center frequency: 865.1+N*0.2, N=0,…,14;
    • Note: support of 400kHz bandwidth in 915-921MHz is TBD.

 

 

SP 2: (information collection)

  • Do Which option do you prefer as AMP-S1G channelization scheme for US?
    • Option 1: full set of channels as regulation allow
      • Bands: 902-928MHz
      • BW: 250kHz
      • Chanel centre frequency: 902.125+N*0.25, N=0,…,103
    • Option 2: align centre frequency with 11ah 1MHz channels
      • Bands: 902-928MHz
      • BW: 250kHz
      • Chanel centre frequency: 902.5+N, N=0,…,25
    • Option 3: first 14MHz of the full set of channels
      • Bands: 902-916MHz
      • BW: 250kHz
      • Chanel centre frequency: 902.125+N, N=0,…,55

 

 

SP 3:

  • Do you agree to add the following text to TG bp SFD?
    • The AMP-S1G Downlink PPDU shall support single data rate:
      • 62.5 kb/s

Note: this motion is a revision of motion #97

 

SP 4:

  • Do you agree to add the following text to TG bp SFD?

o   The AMP-S1G Uplink PPDU shall support at least the following data rates:

      • 250 kb/s
      • 1 Mb/s

 

 

From: Hui Luo <Hui.Luo@xxxxxxxxxxxx>
Sent: Thursday, September 18, 2025 10:49 AM
To: STDS-802-11-TGBP@xxxxxxxxxxxxxxxxx
Subject: Re: [STDS-802-11-TGBP] call for PDT SPs and SPs for SFD

 

Hi Bo,

 

Please add the following SPs for SFD SP queue.

 

  • SP1: Do you agree to add the following text in the TGbp SFD --- 802.11bp shall specify a provisioning protocol that can initialize or update a PMK identified by a PMK ID with mutual authentication using a PSK shared between a configuration AMP AP and an AMP non-AP STA, where (1) the PSK is built in the AMP non-AP STA and obtained by the configuration AMP AP using an OOB method and; (2) the AMP non-AP STA can have an option to send back an encrypted PMK_ID and PMK using an encryption key derived from PSK-based mutual authentication?
  • Note:
    • The secure AMP communication method is defined in Motion 64, 65, 66.
    • Whether to include backscatter non-AP STAs in this method is TBD.
  • Reference: 11-25/1437, 11-25/1086, 11-25/0819.

 

  • SP2: Do you agree to add the following text in the TGbp SFD --- 802.11bp shall specify an optional data field identifying a PMK ID and an AMP AP ID in the first authentication message in which the AMP AP sends ANonce to an AMP non-AP STA, such that the AMP non-AP STA can derive a PMK for secure communication with the AMP AP from a pre-configured PMK identified by the PMK ID for scalability purpose?
  • Note:
    • The secure AMP communication method is defined in Motion 64, 65, 66.
    • Whether to include backscatter non-AP STAs in this method is TBD.
  • Reference: 11-25/1437, 11-25/1086, 11-25/0831.

 

Thanks,

 

Hui

 

 

 

From: sun.bo1@xxxxxxxxxxxxxxxx <sun.bo1@xxxxxxxxxxxxxxxx>
Sent: Wednesday, September 17, 2025 8:07 PM
To:
STDS-802-11-TGBP@xxxxxxxxxxxxxxxxx
Subject: [STDS-802-11-TGBP] call for PDT SPs and SPs for SFD

 

CautionThis e-mail originated outside Infineon Technologies. Please be cautious when sharing information or opening attachments especially from unknown senders. Refer to our intranet guide to help you identify Phishing email.

 

Hello, all, 

 

As announced in the Wed AM2 meeting, we will run PDT SPs during Thu AM1 meeting. And we will run the SPs for SFD after PDT SPs, during the rest time of Thu AM1 meeting, and continue in the Thu PM1 meeting. 

 

I'm hearby calling for PDT SPs and SPs for SFD. The deadline for PDT SP request is end of Wed, the Big Island time. The dealine for SP for SFD request is Thu noon, the Big Island time. Please announce your SP request in the reflector, clearly indicating whether it's a PDT SP or a SP for SFD.

 

Note, we have 6 pending SPs for SFD in SP Set #12, and we will first run these pending SPs after PDT SPs. We also have some SPs requested to defer in past meetings/TCs. If you want to bring back a deferred SP to the SP agenda, please announce it in the reflector as a new SP request. I will schedule all new SP requests into a SP deck document for easier management.

 

Best Regards,

Bo

 

 


To unsubscribe from the STDS-802-11-TGBP list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-11-TGBP&A=1


To unsubscribe from the STDS-802-11-TGBP list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-11-TGBP&A=1


To unsubscribe from the STDS-802-11-TGBP list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-11-TGBP&A=1