Thread Links Date Links
Thread Prev Thread Next Thread Index Date Prev Date Next Date Index

Re: [STDS-802-11-TGBP] call for Straw Poll requests



Hi Bo,


Could you help add the following PDT SP to the queue? Thanks.


PDT SP: Do you agree to incorporate the proposed draft text in document 11-25/1600r8 into the next version of the 11bp draft?


Br,

Yinan




From: 徐伟杰 <00001bc427594473-dmarc-request@xxxxxxxxxxxxxxxxx>
Sent: Thursday, January 15, 2026 3:09 PM
To: STDS-802-11-TGBP@xxxxxxxxxxxxxxxxx
Subject: Re: [STDS-802-11-TGBP] call for Straw Poll requests
 

Hi, Bo,

Could you add following PDT SP to the SP queue:

 

PDT SP: Do you agree to incorporate the proposed draft text in document 11-26/0106r2 into the next version of the 11bp draft?

Thanks.

 

weijie

 

 

 

发件人: lipanpan (D) <00002fa7231ab79a-dmarc-request@xxxxxxxxxxxxxxxxx>
发送时间: 2026115 19:11
收件人: STDS-802-11-TGBP@xxxxxxxxxxxxxxxxx
主题: Re: [STDS-802-11-TGBP] call for Straw Poll requests

 

Hi Bo,

 

Could you add following two SPs to queue:

 

SFD PHY SP:

  • 11bp recommend AMP Energizer to use at least one following high-power channels for WPT transmission in EU:
    • Lower band: channels with center frequency: 865.7MHz, 866.3MHz, 866.9MHz, 867.5MHz, BW: 200kHz
    • Upper band: channels with center frequency: 916.3MHz, 919.9MHz, BW: 400kHz
  • [Ref: 11-26/0131]

 

PDT SP:

  • Do you agree to incorporate the proposed draft text in document 11-26/0132r0 into the next version of the 11bp draft?

 

 

Best,

Panpan

 

From: Alice Jialing Li Chen <jialing.li.phd2@xxxxxxxxx>
Sent: Thursday, January 15, 2026 3:05 PM
To: STDS-802-11-TGBP@xxxxxxxxxxxxxxxxx
Subject: Re: [STDS-802-11-TGBP] call for Straw Poll requests

 

Hi Bo,

 

Could you please queue the following PHY SPs? Thanks.

 

         SP1: Do you agree to add the following to the 11bp SFD:

        4Mbps in AMP UL active transmission in 2.4 GHz is optional

Supporting doc: 11-26/0090r0

 

         SP2: Do you agree to add the following to the 11bp SFD:

        The DL AMP-SIG field uses same data rate, chip duration, and Manchester encoding as the AMP-Data field

Supporting doc: 11-26/0091r0

 

         SP3: Do you agree to add the following to the 11bp SFD:

        The U-SIG field in DL AMP PPDUs includes the following contents:

         BSS Color: set to the BSS Color of the AMP AP

         AMP Version Identifier (1 bit)

        Set to 0 to indicate 802.11bp

         Uplink channel indication (2 bits)

        Set to 0 to indicate the uplink channel is in the same 20MHz, or there is no following uplink transmission

        Set to 1 to indicate the uplink channel is the lower 20MHz channel relative to downlink

        Set to 2 to indicate the uplink channel is the upper 20MHz channel relative to downlink

Supporting doc: 11-26/0091r0, 11-25/2070r2

 

 

         SP4: Do you agree to add the following to the 11bp SFD:

        The U-SIG field in DL AMP PPDUs includes the following contents:

         Bistatic Exciter transmission flag (1 bit)

        Set to 0 to indicate the PPDU is transmitted by an AMP AP

        Set to 1 to indicate the PPDU is transmitted by a bistatic exciter

         Bistatic Exciter Identification (TBD bits)

Supporting doc: 11-26/0091r0, 11-25/2070r2

 

Regards,

Alice

 

On Wed, Jan 14, 2026 at 2:07 PM <sun.bo1@xxxxxxxxxxxxxxxx> wrote:

Hello, all, 

 

Though we still have two meetings in this week, most PDT proposals and tech contributions have been presented and discussed in past meetings. Therefore I'm calling for Straw Polls which will be conducted in the 2nd half of AM1 and 1st half of PM1 on Thursday.

 

Note:

  1. there's only 5 minutes allocated for each PDT SP since it's believed that those PDT proposals have been well discussed offline among TTT members and the TTT has come to certain consensus on those PDT proposals. 
  1. each of the the requested SFD SPs is allocated 5 mins in principle. The SP owner is encouraged to reach out to members and harmonize the SP text offline, especially with those members raising comments or questions during the contribution presentation. 
  1. each SP request should clearly indicate whether it's a SFD SP, a PDT SP or just for information collection. A SFD SP request and a PDT SP request should also clearly include the DCNs of reference documents. 

BTW, those SP requests that have been sent to the reflector are identified and they don't need to be sent to the reflector again after this email.  

 

Best Regards,

Bo

 

 

 

 

 


To unsubscribe from the STDS-802-11-TGBP list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-11-TGBP&A=1


To unsubscribe from the STDS-802-11-TGBP list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-11-TGBP&A=1


To unsubscribe from the STDS-802-11-TGBP list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-11-TGBP&A=1


To unsubscribe from the STDS-802-11-TGBP list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-11-TGBP&A=1


To unsubscribe from the STDS-802-11-TGBP list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-11-TGBP&A=1