| Administrative attachments | 
| 
 | Attachment A1 | 
 | IEEE 802.3 Opening agenda | 
| 
 | Attachment A2 | 
 | IEEE 802.3 Closing agenda | 
| 
 | Attachment A3 | 
 | IEEE 802.3 Opening report | 
| 
 | Attachment A4 | 
 | IEEE 802.3 Closing report | 
| 
 | Attachment A5 | 
 | IEEE 802.3 Meeting attendance procedures | 
| 
 | Attachment A6 | 
 | IEEE 802.3 Voters list | 
| 
 | Attachment A7 | 
 | IEEE 802.3 Membership list | 
| 
 | Attachment A8 | 
 | IEEE 802.3 Potential voter list | 
| 
 | Attachment A9 | 
 | IEEE 802.3 Voters in peril | 
| 
 | Attachment A10 | 
 | IEEE 802.3 Attendance credit summary, July 2017 to October 2018 | 
| 
 | Attachment A11 | 
 | IEEE 802.3 Attendance list Bangkok | 
| 
 | Attachment A12 | 
 | IEEE 802.3 Treasury Report | 
| 
 | Attachment A13 | 
 | IEEE 802.3 Future meetings closing report,  
May 2019 update,  
Huawei poll | 
| 
 | Attachment A14 | 
 | IEEE 802.3 Rules opening report | 
| 
 | Attachment A15 | 
 | IEEE 802.3 Rules closing report | 
| 
 | 
| Task Force and Study Group attachments | 
| 
 | Attachment B1 | 
 | IEEE 802.3 Maintenance opening report | 
| 
 | Attachment B2 | 
 | IEEE 802.3 Maintenance closing report | 
| 
 | Attachment B3 | 
 | IEEE P802.3bt DTE Power via MDI over 4-Pair Task Force opening report | 
| 
 | Attachment B4 | 
 | IEEE P802.3ca 25 Gb/s, 50 Gb/s, and 100 Gb/s Ethernet Passive Optical Networks Task Force opening report | 
| 
 | Attachment B5 | 
 | IEEE P802.3ca 25 Gb/s, 50 Gb/s, and 100 Gb/s Ethernet Passive Optical Networks Task Force closing report | 
| 
 | Attachment B6 | 
 | IEEE P802.3cb 2.5 Gb/s and 5 Gb/s Backplane Task Force opening report | 
| 
 | Attachment B7 | 
 | IEEE P802.3cd 50Gb/s, 100 Gb/s, and 200 Gb/s Ethernet Task Force opening report | 
| 
 | Attachment B8 | 
 | IEEE P802.3.2 (IEEE 802.3cf) YANG data models Task Force opening report | 
| 
 | Attachment B9 | 
 | IEEE P802.3.2 (IEEE 802.3cf) YANG data models Task Force closing report | 
| 
 | Attachment B10 | 
 | IEEE P802.3cg 10 Mb/s Single Twisted Pair Ethernet Task Force opening report | 
| 
 | Attachment B11 | 
 | IEEE P802.3cg 10 Mb/s Single Twisted Pair Ethernet Task Force closing report | 
| 
 | Attachment B12 | 
 | IEEE P802.3ch  Multi-Gig Automotive Ethernet PHY Task Force opening report | 
| 
 | Attachment B13 | 
 | IEEE P802.3ch Multi-Gig Automotive Ethernet PHY Task Force closing report | 
| 
 | Attachment B14 | 
 | IEEE P802.3ck 100 Gb/s, 200 Gb/s, and 400 Gb/s Electrical Interfaces Task Force opening report | 
| 
 | Attachment B15 | 
 | IEEE P802.3ck 100 Gb/s, 200 Gb/s, and 400 Gb/s Electrical Interfaces Task Force closing report | 
| 
 | Attachment B16 | 
 | IEEE P802.3cm 400 Gb/s over Multimode Fiber Task Force opening report | 
| 
 | Attachment B17 | 
 | IEEE P802.3cm 400 Gb/s over Multimode Fiber Task Force closing report | 
| 
 | Attachment B18 | 
 | IEEE P802.3cn 50 Gb/s, 100 Gb/s, 200 Gb/s, and 400 Gb/s over SMF and DWDM Task Force opening report | 
| 
 | Attachment B19 | 
 | IEEE P802.3cn 50 Gb/s, 100 Gb/s, 200 Gb/s, and 400 Gb/s over SMF and DWDM Task Force closing report | 
| 
 | Attachment B20 | 
 | IEEE P802.3cq Power over Ethernet over 2 Pairs (Maintenance #13) Task Force opening report | 
| 
 | Attachment B21 | 
 | IEEE P802.3cq Power over Ethernet over 2 Pairs (Maintenance #13) Task Force closing report | 
| 
 | Attachment B22 | 
 | IEEE P802.3cr Isolation (Maintenance #14) Task Force opening report | 
| 
 | Attachment B23 | 
 | IEEE P802.3cr Isolation (Maintenance #14) Task Force closing report | 
| 
 | Attachment B24 | 
 | IEEE 802.3 Bidirectional 10 Gb/s, 25 Gb/s, and 50 Gb/s Optical Access PHYs Study Group opening report | 
| 
 | Attachment B25 | 
 | IEEE 802.3 Bidirectional 10 Gb/s, 25 Gb/s, and 50 Gb/s Optical Access PHYs Study Group closing report | 
| 
 | Attachment B26 | 
 | IEEE 802.3 Physical Layers for increased-reach Ethernet optical subscriber access (Super-PON) Study Group opening report | 
| 
 | Attachment B27 | 
 | IEEE 802.3 Physical Layers for increased-reach Ethernet optical subscriber access (Super-PON) Study Group closing report | 
| 
 | Attachment B28 | 
 | Industry Connections New Ethernet Applications opening report | 
| 
 | Attachment B29 | 
 | Industry Connections New Ethernet Applications closing report | 
| 
 | Attachment B30 | 
 | IEEE 802.3 SCC18 Ad Hoc closing report | 
| 
 | Attachment B31 | 
 | Call for interest: 100 Gb/s Lambda opening report | 
| 
 | Attachment B32 | 
 | Call for interest: 100 Gb/s Lambda closing report | 
| 
 | 
| Liaison Attachments (External and Internal) | 
| 
 | Attachment C1 | 
 | ISO/IEC SC25/WG3 report to IEEE 802.3 | 
| 
 | Attachment C2 | 
 | TIA TR-42 Liaison Report to IEEE 802.3 | 
| 
 | Attachment C3 | 
 | ISO/IEC SC25 to IEEE 802.3 on Liaison officer - updated 
 | 
| 
 | Attachment C4 | 
 | COBO to IEEE 802.3 on specification availability 
 | 
| 
 | Attachment C5 | 
 | ITU-T SG15 to IEEE 802.3 regarding the ANT Standards Overview and Work Plan 
 | 
| 
 | Attachment C6 | 
 | ITU-T SG15 to IEEE 802.3 regarding the HNT Standards Overview and Work Plan 
 | 
| 
 | Attachment C7 | 
 | ITU-T SG15 to IEEE 802.3 regarding the ANT and HNT documents 
 | 
| 
 | Attachment C8 | 
 | ITU-T SG15 to IEEE 802.3 on the IEEE 802.3cb 2.5 Gb/s specification
 Attachment (Password protected)
 
 | 
| 
 | Attachment C9 | 
 | ITU-T SG15 to IEEE 802.3 regarding SG15 work on G.709.3 and G.698.2
 Attachments (Password protected)
 
 
 | 
| 
 | Attachment C10 | 
 | ITU-T SG15 to IEEE 802.3 on coordination of Ethernet information and data modelling work
 - updated 
 | 
| 
 | Attachment C11 | 
 | MEF to IEEE 802.3 on MEF 63 and operator L1 service attributes 
 | 
| 
 | Attachment C12 | 
 | ITU-T JCA-IMT2020 to IEEE 802.3 on invitation to update the IMT2020 roadmap 
 | 
| 
 | Attachment C13 | 
 | OIF to IEEE 802.3 regarding 400ZR Interop Project
 Attachment (Password protected)
 
 
 | 
| 
 | Attachment C14 | 
 | TIA TR42 to IEEE 802.3 regarding balanced single pair connector selection 
 | 
| 
 | Attachment C15 | 
 | DRAFT liaison to MEF regarding update on MEF 63 and Operator L1 Service Attributes 
 | 
| 
 | Attachment C16 | 
 | DRAFT liaison to ITU-T SG15 on coordination of Ethernet information and data modelling work 
 | 
| 
 | Attachment C17 | 
 | DRAFT liaison to ISO/IEC SC25/WG3 on single pair Ethernet 
 | 
| 
 | Attachment C18 | 
 | DRAFT liaison to COBO on status of IEEE P802.3cm, P802.3ck, and P802.3cn projects 
 | 
| 
 | Attachment C19 | 
 | DRAFT liaison to ISO/IEC SC25/WG3 regarding ISO/IEC TR 11801-9909 
 | 
| 
 | Attachment C20 | 
 | Liaison to MEF regarding update on MEF 63 and Operator L1 Service Attributes 
 | 
| 
 | Attachment C21 | 
 | Liaison to ITU-T SG15 on coordination of Ethernet information and data modelling work 
 | 
| 
 | Attachment C22 | 
 | Liaison to ISO/IEC SC25/WG3 on single pair Ethernet 
 | 
| 
 | Attachment C23 | 
 | Liaison to COBO on status of IEEE P802.3cm, P802.3ck, and P802.3cn projects 
 | 
| 
 | Attachment C24 | 
 | Liaison to ISO/IEC SC25/WG3 regarding ISO/IEC TR 11801-9909 
 |