IEEE P802.3ca 50G-EPON Task Force

Physical Layer Specifications and Management Parameters for 25 Gb/s and 50 Gb/s Passive Optical Networks

A Task Force interim teleconference meeting is planned for March 18, 8:00 MDT. Please send email to Curtis Knittle (c.knittle@cablelabs.com) to register for the meeting.

The face-to-face meeting originally planned for week of March 16 in Atlanta has been cancelled (see the announcement).

For general 802.3 meeting location and logistics, see the IEEE 802.3 Ethernet interim sessions web page.

Standards Association balloting for the D3.1 draft standard, the 2nd recirculation, will close on March 12, 2020 at 23:59 AoE.

Minutes of the February interim teleconference meeting are now available in the February 2020 repository.

Standard Drafts ↑

  • Standards Association ballot
    • D3.1 — 2020-Jan-22
    • D3.0 — 2019-Nov-11
  • Working Group ballot
    • D2.2 — 2019-Sep-16
    • D2.1 — 2019-Aug-01
    • D2.0 — 2019-May-22
  • Task Force review
    • D1.6 — 2019-Mar-21
    • D1.5 — 2019-Jan-23
    • D1.4 — 2018-Nov-27
    • D1.3 — 2018-Sep-28
    • D1.2 — 2018-Jul-18
    • D1.1 — 2018-May-23
    • D1.0 — 2018-Mar-12
  • Initial baseline
    • D0.7 — 2018-Jan-28
    • D0.6 — 2017-Nov-14
    • D0.5 — 2017-Sep-14
    • D0.4 — 2017-Jun-02
    • D0.3 — 2017-Mar-16
    • D0.2 — 2017-Feb-06
    • D0.1 — 2016-Dec-16

Search

Search Area:
IEEE 802.3 NG-EPON Study Group Meeting Archives
IEEE 802.3 NG-EPON Study Group E-mail Archive
IEEE 802.3ca 50G-EPON Task Force Meeting Archives
IEEE 802.3ca 50G-EPON Task Force E-mail Archive
Search Terms:
Search terms are stemmed. For example: network matches networks and networked.
    Help
Last modified: 01-Nov-2019