Thread Links Date Links
Thread Prev Thread Next Thread Index Date Prev Date Next Date Index

Re: [STDS-802-11-TGBI] Discussion on EPP element in Association



hi Antonio, 
thanks for bringing this up. 
I think the direction we’re going is to have different BPE and CPE subclauses to clarify BPE vs CPE specific behaviours.

I have some concerns if we do not include the EPP Element because that would enforce defining some default value or a different behavior for AID storage size determination which might not work for all scenarios and all STAs. 

At this point, I would be supportive of your option (1).
An alternative would be a slight variation of (1) where:

regards
Domenico


From: Antonio DeLaOlivaDelgado <aoliva@xxxxxxxx>
Date: Tuesday, 14 October 2025 at 18:27
To: STDS-802-11-TGBI@xxxxxxxxxxxxxxxxx <STDS-802-11-TGBI@xxxxxxxxxxxxxxxxx>
Subject: [STDS-802-11-TGBI] Discussion on EPP element in Association

Dear,
We are having a parallel discussion about the mandatory use of the EPP element in (Re)Association Request frames. We need this to agree on the BPE and CPE operation in clause 10.71.2.2.
- it is true that in the (Re)Association Request frame definition, the EPP element is defined as optional.
- yesterday we agreed on having the EPP element sent (with a shall) in (Re)Association request frames due to the need of sending always the AID storage size in section 10.71.2.2. We need to make this coherent with the definition of the (Re)Association Request frame if we keep it like that.
- the EPP element includes the epoch duration as a mandatory field. When designing this element we decided to always send the most important information for an epoch, its duration. The non-AP declares a will to join a group with this duration, while the AP states the actual duration of the group it assigns the non-AP to.

Now, we have an issue with BPE. It looks like BPE aims at having the EPP element included in the (Re)Association Request frame, but only with the AID storage size (if I understood correctly). 

I see four options to this, and we need to decide soon since we need to have the text ready asap:
1- We change the EPP Epoch Settings field to not have the Epoch duration as a mandatory field.
2- We declare the EPP element is optional in (Re)Association request frames for BPE and mandatory for CPE.
3- We do not have the EPP element mandatory in (Re)Association Request frames no matter the CPE or BPE.
4- BPE learns to live with the Epoch duration in the EPP element for (Re)Association request frames

I would go for #2 to be honest.

Thanks
Antonio

To unsubscribe from the STDS-802-11-TGBI list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-11-TGBI&A=1


To unsubscribe from the STDS-802-11-TGBI list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-11-TGBI&A=1