Thread Links Date Links
Thread Prev Thread Next Thread Index Date Prev Date Next Date Index

[STDS-802-11-TGBP] : SP texts about Service Period grouping



Hi all,

For 26/0100, AMP Service Period grouping, we did not go through the SP texts. I would like to get your opinions here before Thursday.

Do you agree to add the following text into the 11bp SFD ?

  • When UL access information is present in the SP Advert frame, N sets of SP parameters shall be derived through the configured one set of SP parameters in the SP Advert frame, where N is the number of sub-groups derived from SP ID.
  • The N sets of SP parameters share the same configured SP Interval, and SP Minimum Wake Duration of the configured one set of SP parameters, but have individual SP Start Time.
  • The SP Start Time  of nth set of SP parameters is determined by the equation:
    • SP Start Time(n)= SP Start Time + n*(SP Interval/N), n=[0,N-1], where SP Start Time belongs to the configured one set of SP parameters in the SP Advert frame.

Thanks,
Sam


To unsubscribe from the STDS-802-11-TGBP list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-11-TGBP&A=1