|
Hi Bo,
Please help to add the following
new SP
SP #1
Do you agree to add the following text into the 11bp SFD ?
-
When UL access information is present in the SP Advert frame, N sets of SP parameters shall be derived through the configured one set of SP parameters in the SP Advert frame, where N is the number of sub-groups derived from SP ID.
-
The N sets of SP parameters share the same configured SP Interval, and SP Minimum Wake Duration of the configured one set of SP parameters, but have individual SP Start Time.
-
The SP Start Time of nth set of SP parameters is determined by the equation:
-
SP Start Time(n)= SP Start Time + n*(SP Interval/N), n=[0,N-1], where SP Start Time belongs to the configured one set of SP parameters in the SP Advert frame.
[Reference contributions: 11-24/1775r0, 11-25/0032r0, 11-25/0813r0, 11-25/1252r0, 11-25/1581r0, 11-25/2093r0]
SP #2
Do you agree to add the following to 11bp SFD as:
-
In a time-slot-based random access session for non-AP AMP STAs, an AMP AP shall transmit an AMP trigger frame that includes a parameter Q, which indicates a maximum contention window of 2^Q-1, and a parameter
N, which indicates the number of time slots for that TXOP.
-
For a received AMP trigger, a non-AP AMP STA shall select a random number, X, uniformly from [0 ,2^Q-1]. If X<N, the non-AP AMP STA shall transmit in time slot X+1 in the TXOP; otherwise, it shall not transmit in that TXOP.
[Reference contributions: 11-26/0143r0]
Thanks,
Sam
From: sun.bo1@xxxxxxxxxxxxxxxx <sun.bo1@xxxxxxxxxxxxxxxx>
Sent: Wednesday, January 14, 2026 2:07 PM
To: STDS-802-11-TGBP@xxxxxxxxxxxxxxxxx <STDS-802-11-TGBP@xxxxxxxxxxxxxxxxx>
Subject: [STDS-802-11-TGBP] call for Straw Poll requests
Hello, all,
Though we still have two meetings in this week, most PDT proposals and tech contributions have been presented and discussed in past meetings. Therefore I'm calling for Straw Polls
which will be conducted in the 2nd half of AM1 and 1st half of PM1 on Thursday.
Note:
-
there's only 5 minutes allocated for each PDT SP since it's believed that those PDT proposals have been well discussed offline among TTT members and the TTT has come to certain consensus
on those PDT proposals.
-
each of the the requested SFD SPs is allocated 5 mins in principle. The SP owner is encouraged to reach out to members and harmonize the SP text offline, especially with those members
raising comments or questions during the contribution presentation.
-
each SP request should clearly indicate whether it's a SFD SP, a PDT SP or just for information collection. A SFD SP request and a PDT SP request should also clearly include the
DCNs of reference documents.
BTW, those SP requests that have been sent to the reflector are identified and they don't need to be sent to the reflector again after this email.
Best Regards,
Bo
To unsubscribe from the STDS-802-11-TGBP list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-11-TGBP&A=1
To unsubscribe from the STDS-802-11-TGBP list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-11-TGBP&A=1
|