IEEE 802.3 400 Gb/s/Lane Signaling Study Group
|
|
|
| Date |
Author(s) |
Affiliation(s) |
|
Contributions
|
|||
| Agenda and General
Information |
11 May 2026 |
Kent Lusted |
Synopsys |
| Unapproved Minutes |
Beth Kochuparambil Kent Lusted |
Cisco Synopsys |
|
| Straw Polls and
Motions |
12 May 2026 |
Beth Kochuparambil Kent Lusted |
Cisco Synopsys |
| 400GPL Timeline
Considerations |
5 May 2026 |
Kent Lusted Mark Nowell |
Synopsys Cisco |
| Clarifying Optical
Terminology or Nomenclature |
10 May 2026 |
Mark Nowell Kent Lusted |
Cisco Synopsys |
| BER objective for 400
Gb/s per lane PHYs |
11 May 2026 |
Matt Brown David Ofelt Kent Lusted |
Qualcomm HPE Synopsys |
| Proposed SMF Objectives
for 400GPL |
11 May 2026 |
Brian Welch John Johnson Mike Dudek Sridhar Ramesh Jose Galan Guangcan Mi Eric Maniloff Michael He Vasu Parthasarathy Mark Nowell |
Cisco Broadcom Marvel Maxlinear Maxlinear Huawei Ciena Terahop Broadcom Cisco |
| 400GPL Proposed AUI
Objectives |
11 May 2026 |
Beth Kochuparambil Luz Osorio Matt Brown |
Cisco Nokia Qualcomm |
| Proposed Copper
Cable Objectives for 400G per lane |
11 May 2026 |
Beth Kochuparambil Jim Weaver |
Cisco Arista |
| Proposed CSD responses
for 400GPL Study Group |
11 May 2026 |
Mark Nowell John D'Ambrosia David Ofelt Matt Brown Beth Kochuparambil Mabud Chowdhury David Law Adam Healey Kent Lusted |
Cisco Futurewei, U.S. Subsidiary of Huawei HPE Qualcomm Cisco Genuine Optics HPE Broadcom Synopsys |
| Proposed Draft IEEE
P802.3dv PAR Responses |
11 May 2026 |
John D'Ambrosia Kent Lusted Mark Nowell |
Futurewei, U.S. Subsidiary of Huawei Synopsys Cisco |
| How
NPO May Fit in IEEE 400GPL |
11 May 2026 |
Guangcan Mi Xiang He |
Huawei Huawei |
| Package-Level
Considerations for 400GPL Feasibility |
6 May 2026 |
Toshiaki Sakai FutoshiTerasawa Masaki Fujioka |
Socionext Socionext Socionext |
| Consideration on NPO and
CPO at 400Gbps/lane |
5 May 2026 |
Runlong Hu Haojie Wang Weiqiang Cheng |
China Mobile China Mobile China Mobile |
| The consideration on
modulation formats of 400Gbps per lane optical signal |
11 May 2026 |
Xiaojie Fan Yu Xu Ping Liao Li Xu |
Huawei Technologies Huawei Technologies Huawei Technologies Huawei Technologies |
| Feasibility Study and DSP
Considerations for 400G/lane PAM4 Co-Packaged Optics |
5 May 2026 |
Tom Berger Maxim Kuschnerov |
Huawei Technologies Huawei Technologies |
| Draft P802.3dv PAR |
11 May 2026 |
Kent Lusted |
Synopsys |
Return to the IEEE 400 Gb/s/Lane
Signaling Study Group Public Area
Last Update: 18 May 2026
|
|
|
|