| Administrative attachments |
|
Attachment A1 |
|
IEEE 802.3 Opening agenda |
|
Attachment A2 |
|
IEEE 802.3 Closing agenda |
|
Attachment A3 |
|
IEEE 802.3 Opening report |
|
Attachment A4 |
|
IEEE 802.3 Closing report |
|
Attachment A5 |
|
IEEE 802.3 Meeting attendance procedures |
|
Attachment A6 |
|
IEEE 802.3 Voters list |
|
Attachment A7 |
|
IEEE 802.3 Membership list |
|
Attachment A8 |
|
IEEE 802.3 Potential voter list |
|
Attachment A9 |
|
IEEE 802.3 Voters in peril |
|
Attachment A10 |
|
IEEE 802.3 Attendance credit summary |
|
Attachment A11 |
|
IEEE 802.3 Attendance list November 2026 Plenary |
|
Attachment A12 |
|
IEEE 802.3 Treasury Report |
|
Attachment A13 |
|
IEEE 802.3 Future meetings closing report |
|
| Task Force and Study Group attachments |
|
| Opening plenary meeting reports |
|
Attachment B1 |
|
IEEE 802.3 Maintenance opening report |
|
Attachment B2 |
|
IEEE P802.3dj 200 Gb/s, 400 Gb/s, 800 Gb/s, and 1.6 Tb/s Ethernet Task Force opening report |
|
Attachment B3 |
|
IEEE P802.3dm Asymmetrical Electrical Automotive Ethernet Task Force opening report |
|
Attachment B4 |
|
IEEE P802.3dp Cabling Restrictions for Single Pair Power over Ethernet Task Force opening report |
|
Attachment B5 |
|
IEEE P802.3dq Pin-Optimized PHY Interface Task Force opening report |
|
Attachment B6 |
|
IEEE 802.3dr Optical Automotive Ethernet TDFOM Task Force opening report |
|
Attachment B7 |
|
IEEE P802.3ds 200 Gb/s per Wavelength MMF PHYs Task Force opening report |
|
Attachment B8 |
|
IEEE P802.3dt Ethernet Metadata Services Task Force opening report |
|
Attachment B9 |
|
IEEE 802.3du Revision to IEEE Std 802.3-2022 Maintenance #18 Task Force opening report |
|
Attachment B10 |
|
IEEE 802.3 400 Gb/s/Lane Signaling Study Group opening report |
|
Attachment B11 |
|
IEEE 802.3 FMP Ethernet Interoperability Study Group opening report |
|
Attachment B12 |
|
IEEE 802.3 PLCA Enhancements Study Group opening report |
|
Attachment B13 |
|
IEEE 802.3 New Ethernet Applications Ad Hoc opening report |
|
Attachment B14 |
|
IEEE 802.3 New Ethernet Applications Ad Hoc Ethernet for AI Assessment opening report |
|
Attachment B15 |
|
IEEE 802.3 PDCC Ad Hoc opening report |
|
Attachment B16 |
|
IEEE 802.3 Channel Operating Margin (COM) Open Source Project Ad Hoc opening report |
|
Attachment B17 |
|
IEEE 802.3 YANG Open Source Project Ad Hoc opening report |
|
| Closing plenary meeting reports |
|
Attachment C1 |
|
IEEE 802.3 Maintenance closing report |
|
Attachment C2 |
|
IEEE P802.3dj 200 Gb/s, 400 Gb/s, 800 Gb/s, and 1.6 Tb/s Ethernet Task Force closing report |
|
Attachment C3 |
|
IEEE P802.3dm Asymmetrical Electrical Automotive Ethernet Task Force closing report |
|
Attachment C4 |
|
IEEE P802.3dp Cabling Restrictions for Single Pair Power over Ethernet Task Force closing report |
|
Attachment C5 |
|
IEEE P802.3dq Pin-Optimized PHY Interface Task Force closing report |
|
Attachment C6 |
|
IEEE 802.3dr Optical Automotive Ethernet TDFOM Task Force closing report |
|
Attachment C7 |
|
IEEE P802.3ds 200 Gb/s per Wavelength MMF PHYs Task Force closing report |
|
Attachment C8 |
|
IEEE P802.3dt Ethernet Metadata Services Task Force closing report |
|
Attachment C9 |
|
IEEE 802.3du Revision to IEEE Std 802.3-2022 Maintenance #18 Task Force closing report |
|
Attachment C10 |
|
IEEE 802.3 400 Gb/s/Lane Signaling Study Group closing report |
|
Attachment C11 |
|
IEEE 802.3 FMP Ethernet Interoperability Study Group closing report |
|
Attachment C12 |
|
IEEE 802.3 PLCA Enhancements Study Group closing report |
|
Attachment C13 |
|
IEEE 802.3 New Ethernet Applications Ad Hoc closing report |
|
Attachment C14 |
|
IEEE 802.3 New Ethernet Applications Ad Hoc Ethernet for AI Assessment closing report |
|
Attachment C15 |
|
IEEE 802.3 PDCC Ad Hoc closing report |
|
Attachment C16 |
|
IEEE 802.3 Channel Operating Margin (COM) Open Source Project Ad Hoc closing report |
|
Attachment C17 |
|
IEEE 802.3 YANG Open Source Project Ad Hoc closing report |
|
| Liaison Attachments (External and Internal) |
|
Attachment D1 |
|
As needed |
|
| Draft Outgoing Liaison Letters and Liaison Contribution |
|
Attachment E1 |
|
As needed |
|
| Final Outgoing Liaison Letters and Liaison Contribution |
|
Attachment F1 |
|
As needed |