Meeting Materials
| all_files.zip 7-May-08 8.58M | |||||
| Approved Meeting Minutes 19-May-08 79K | George Oulundsen | OFS | |||
|   General   | |||||
| Agenda and General Information 7-May-08 283K | John D'Ambrosia | Force10 Networks | |||
| Chief Editor's Report 7-May-08 78K | Ilango Ganga | Intel | |||
|   Liaisons & Communications   | |||||
| OIF Letter regarding Common Electrical I/O – 28 Gbps – Short Reach Project 13-May-08 112K | |||||
| Liaison report from ISO/IEC JTC 1/SC 25/WG 3 to IEC SC 86A on Maximum attenuation values for buffered and cabled B1.3 Optical Fibres 7-May-08 21K | ISO/IEC JTC 1/SC 25/WG | ||||
|   Presentations Related to Architecture / Interfaces    | |||||
| Level Setting – Interfaces and Architecture 7-May-08 349K | Gary Nicholl Mark Nowell John D'Ambrosia Ilango Ganga Adam Healey | Cisco Cisco Force10 Networks Intel LSI | |||
| 40/100G Architecture and Interfaces proposal 7-May-08 120K | Ilango Ganga Brad Booth Gary Nicholl Howard Frazier Shimon Muller | Intel AMCC Cisco Broadcom Sun | |||
| XL/CGMII and RS Proposal 7-May-08 55K | Mark Gustlin | Cisco | |||
| 100/40Ge PCS proposal 7-May-08 91K | Mark Gustlin | Cisco | |||
| 100/40Ge PMA proposal 7-May-08 53K | Mark Gustlin | Cisco | |||
| Dynamic skew for MLD 7-May-08 61K | Mark Gustlin Pete Anslow | Cisco Nortel | |||
| 100/40GE Max skew budget for MLD 12-Mar-08 568K | Brad Booth Keith Conroy Francesco Caggioni Dimitris Giannakopoyulos | AMCC 
 
 | |||
| Propagation Delay Skew in Multimode Channels (Attaching backup spreadsheet by Paul Kolesar, Systimax)   8-May-08 135K | Paul Kolesar Pete Anslow | Systimax Nortel | |||
| XLAUI/CAUI Electrical Specifications 7-May-08 701K | Ali Ghiasi Ryan Latchman | Broadcom Gennum | |||
| The equivalent of XAUI and other architectural considerations in 40G/100G Ethernet 7-May-08 60K | Piers Dawe | Avago | |||
| IPG Considerations 7-May-08 251K | Faisal Dada Norbert Folkens | JDSU 
 | |||
| Proposal for FEC in 40G/100G Ethernet 7-May-08 36K | Piers Dawe John Petrilla | Avago 
 | |||
| Observations on Electrical Definition for Non-retimed PMD Service Interface 7-May-08 251K | Gary Nicholl Mark Nowell | Cisco 
 | |||
| Proposed Characteristics for 40GBASE-SR4 & 100GBASE-SR10 TP1 & TP4 PMD Service Interfaces 7-May-08 134K | John Petrilla | Avago | |||
|   Presentations related to OTN Objective    | |||||
| Appropriate Support for OTN Baseline Proposal 7-May-08 162K | Steve Trowbridge | Alcatel-Lucent | |||
| PHY error rate monitoring for 40GbE and 100GbE 7-May-08 187K | Gary Nicholl | Cisco | |||
| PHY OAM and Lane Fault Monitoring 12-Mar-08 918K | Li Zeng Min Ye Qiwen Zhong WB Jiang | Huawei 
 
 | |||
| 40GE and 100GE Transport over OTN 12-Mar-08 773K | Li Zeng Qiwen Zhong WB Jiang | Huawei 
 
 | |||
|   Presentations Related to 40GbE / 100 GbE SMF Objectives   | |||||
| Choice of grid for 10km 100GbE 7-May-08 18K | Pete Anslow Joel Goergen John Jaeger Andy Moorwood Jeffery Maki Mark Nowell Gary Nicholl Steve Trwobridge Jesse Simsarian | Nortel Force10 Networks Infinera Infinera Juniper Cisco Cisco Alcatel-Lucent Alcatel-Lucent | |||
| 100GE 10km SMF PMD 7-May-08 181K | Chris Cole Bernd Huebner Pete Anslow John Johnson Radha Nagarajan Hirotaka Oomori | Finisar Finisar Nortel CyOptics Infinera Sumitomo | |||
| 10x10G WDM 10km SMF PMD Proposal 7-May-08 572K | Thomas Schrans Jim Tavacoli | Santur 
 | |||
| 100GE 40km SMF PMD 7-May-08 215K | Chris Cole Pete Anslow Ramon Gutierrez Wenbin Jiang John Johnson Radha Nagarajan Hirotaka Oomori Matt Traverso | Finisar Nortel UNAM Huawei CyOptics Infinera Sumitomo Opnext | |||
| 40GE 10km SMF PMD 7-May-08 104K | Chris Cole Eddie Tsumura | Finisar ExceLight | |||
| 40GE 10km SMF PMD configuration 7-May-08 258K | Youichi Akasaka Kazuyuki Mori Hideki Isono | Fujitsu 
 | |||
| 40GbE Serial Proposal 7-May-08 64K | Jack Jewell | JDSU | |||
| 40GbE 10km SMF Serial Proposal (Updated) 19-May-08 176K | Farzin Firoozmand Hideki Isono Jack Jewell Kazuyuki Mori Song Shang Matt Traverso | SMI Fujitsu Ltd JDSU Fujitsu Lab SMI Opnext | |||
|   Presentations Related to 40GbE / 100 GbE MMF Objectives    | |||||
| 40Gb/s SMF and MMF Considerations 20-Mar-08 290K | Frank Chang Ali Ghiaisi | Vitesse Broadcom | |||
| Proposal for a PMD for 100GBASE-SR10 and 40GBASE-SR4 and Related Specifications 7-May-08 215K | Petar Pepeljugoski Piers Dawe John Petrilla John Dallesasse Kenneth Jackson Lew Aronson Jonathan King Chris Cole Mike Dudek Jack Jewell Phil McClay | IBM Avago Technologies Avago Technologies Emcore Emcore Finisar Finisar Finisar JDSU JDSU Zarlink | |||
| Exploring the Transmitter Parameter Space for 100m Links for 100GBASE-SR10 and 40GBASE-SR4 7-May-08 34K | Petar Pepeljugoski | IBM | |||
| Analysis of 40GBASE-SR4 & 100GBASE-SR10 Proposals 7-May-08 73K | John Petrilla | Avago | |||
| Proposal for Extended Reach MMF Link Characteristics 7-May-08 67K | Jack Jewell | JDSU | |||
| Connector loss budgeting methodology for parallel multimode PMDs' 7-May-08 82K | Jonathan King | Finisar | |||
| 40Gbit/s and 100 Gbit/s Transmission over OM3 Duplex Fiber 7-May-08 261K | J.R. Kropp N. Ledentsov J Lott H. Quast | V-I Systems 
 | |||
| Introduction of 25Gbps Directly Modulated VCSELs 20-Mar-08 415K | Kenichiro Yashiki Hikaru Kouta | NEC 
 | |||
|   Presentations Related to 40GbE Backplane Objective    | |||||
| 40GBASE-KR4 backplane PHY proposal and Next Steps 20-Mar-08 235K | Rich Mellitz Ilango Ganga | Intel 
 | |||
|   Presentations Related to 40 GbE / 100 GbE Cu Cabling Objectives    | |||||
| 802.3ba copper cable assembly proposal 7-May-08 864K | Chris Diminico | MC Communications | |||
| FEC and Auto-Neg proposal for 40/100G copper cable assembly 7-May-08 77K | Ilango Ganga | Intel | |||
| Adaptive Transmit Equalization Proposal for 40GBASE-CR4 and 100GBASE-CR10 20-Mar-08 114K | Amir Mezer Adee Ran | Intel 
 | |||
| SFF-8470 10GBASE-KR Concepts for 802.3ba 7-May-08 415K | Bob Thornton | Fujitsu | |||
| Proposal for New Internal and External High Density 10 X 10.3125 Gbps Connector System based on 10GBASE-KR 18-May-08 364K | Michael Fogg | Tyco | |||
Return to IEEE P802.3ba 
Home Page
Last Update: 18 May 2008
Questions or comments: send e-mail to Webmaster