| Administrative attachments |
|
Attachment A1 |
|
IEEE 802.3 Opening agenda |
|
Attachment A2 |
|
IEEE 802.3 Closing agenda |
|
Attachment A3 |
|
IEEE 802.3 Opening report |
|
Attachment A4 |
|
IEEE 802.3 Closing report |
|
Attachment A5 |
|
IEEE 802.3 Meeting attendance procedures |
|
Attachment A6 |
|
IEEE 802.3 Voters list (v5 - final) |
|
Attachment A7 |
|
IEEE 802.3 Membership list(as of 20 Feb 2026) |
|
Attachment A8 |
|
IEEE 802.3 Potential voter list (v3) |
|
Attachment A9 |
|
IEEE 802.3 Voters in peril |
|
Attachment A10 |
|
IEEE 802.3 Attendance credit summary, November 2024 to January 2026 |
|
Attachment A11 |
|
IEEE 802.3 Attendance list March 2026 Plenary |
|
Attachment A12 |
|
IEEE 802.3 Treasury Report |
|
Attachment A13 |
|
IEEE 802.3 Future meetings closing report
|
|
Attachment A14 |
|
IEEE 802.3 September 2027 Offer to hostt
|
|
Attachment A15 |
|
IEEE 802.3 January 2028 Offer to host
|
|
Attachment A16 |
|
TIA TR-42 Liaison report
|
|
Attachment A17 |
|
INCITS/FibreChannel liaison report
|
|
Attachment A18 |
|
IEEE 802.3 rules opening report
|
|
Attachment A19 |
|
IEEE 802.3 rules closing report
|
|
Attachment A20 |
|
IEEE 802.3 400 Gbps per lane PHYs and Interfaces CFI |
|
Attachment A21 |
|
IEEE 802.3 Fault Managed Power Ethernet Powering Techniques CFI |
|
Attachment A22 |
|
Joint IEEE 802 / ITU-T SG15 Workshop |
|
| Task Force and Study Group attachments |
|
| Opening plenary meeting reports |
|
Attachment B1 |
|
IEEE 802.3 Maintenance opening report |
|
Attachment B2 |
|
IEEE P802.3da 10 Mb/s Single Pair Multidrop Segments Enhancement Task Force opening report |
|
Attachment B3 |
|
IEEE P802.3dg 100 Mb/s Long-Reach Single Pair Ethernet Task Force opening report |
|
Attachment B4 |
|
IEEE P802.3dj 200 Gb/s, 400 Gb/s, 800 Gb/s, and 1.6 Tb/s Ethernet Task Force opening report(v2) |
|
Attachment B5 |
|
IEEE P802.3dk Greater than 50 Gb/s Bidirectional Optical Access PHYs Task Force opening report (v1) |
|
Attachment B6 |
|
IEEE P802.3dm Asymmetrical Electrical Automotive Ethernet Task Force opening report |
|
Attachment B7 |
|
IEEE P802.3dp Single-Pair Ethernet Powering Cabling Restrictions Task Force Opening Report |
|
Attachment B8 |
|
IEEE P802.3dq Pin-Optimized PHY Interface Task Force opening report |
|
Attachment B9 |
|
IEEE P802.3-2022/Cor 2 (IEEE 802.3dr) Optical Automotive Ethernet TDFOM opening report |
|
Attachment B10 |
|
IEEE P802.3ds 200 Gb/s per wavelength Multimode Fibre (MMF) optical PHYs Task Force opening report |
|
Attachment B11 |
|
IEEE P802.3dt Ethernet Metadata Services Task Force opening report |
|
Attachment B12 |
|
IEEE 802.3 New Ethernet Applications Ad Hoc opening report |
|
Attachment B13 |
|
IEEE 802.3 Power Delivery Coordinating Committee Ad Hoc opening report |
|
Attachment B14 |
|
IEEE 802.3 Channel Operating margin (COM) opening report |
|
Attachment B15 |
|
IEEE 802.3 YANG OS Project Ad Hoc opening report |
|
Attachment B16 |
|
IEEE 802.3 400 Gbps per lane PHYs and Interfaces CFI opening report |
|
Attachment B17 |
|
IEEE 802.3 Fault Managed Power Ethernet Powering Techniques CFI opening report |
|
| Closing plenary meeting reports |
|
Attachment C1 |
|
IEEE P802.3dg 100 Mb/s Long-Reach Single Pair Ethernet Task Force closing report |
|
Attachment C2 |
|
IEEE P802.3dj 200 Gb/s, 400 Gb/s, 800 Gb/s, and 1.6 Tb/s Ethernet Task Force closing report(v2) |
|
Attachment C3 |
|
IEEE P802.3dk Greater than 50 Gb/s Bidirectional Optical Access PHYs Task Force closing report |
|
Attachment C4 |
|
IEEE P802.3dm Asymmetrical Electrical Automotive Ethernet Task Force closing report |
|
Attachment C5 |
|
IEEE P802.3dq Pin-Optimized PHY Interface Task Force closing report |
|
Attachment C6 |
|
IEEE P802.3-2022/Cor 2 (IEEE 802.3dr) Optical Automotive Ethernet TDFOM closing report |
|
Attachment C7 |
|
IEEE P802.3ds 200 Gb/s per wavelength Multimode Fibre (MMF) optical PHYs Task Force closing report |
|
Attachment C8 |
|
IEEE P802.3dt Ethernet Metadata Services Task Force closing report |
|
Attachment C9 |
|
IEEE 802.3 NEA "Ethernet for AI" Ad Hoc closing report |
|
Attachment C10 |
|
IEEE 802.3 Channel Operating margin (COM) closing report |
|
Attachment C11 |
|
IEEE 802.3 YANG OS Project Ad Hoc closing report |
|
Attachment C12 |
|
IEEE 802.3 400 Gbps per lane PHYs and Interfaces CFI closing report |
|
Attachment C13 |
|
IEEE 802.3 Fault Managed Power Ethernet Powering Techniques CFI closing report |
|
| Liaison Attachments (External and Internal) |
|
Attachment D1 |
|
TIA TR42 to IEEE 802.3: Request for insights from IEEE 802.3 on 2-row MPO variants |
|
| Draft Outgoing Liaison Letters and Liaison Contribution |
|
Attachment E1 |
|
Draft IEEE 802.3 to UEC, OIF, UALink, ITU-T, INCITS: IEEE 802.3 Ethernet 400 Gbps/lane Signaling (400GPL) Study Group |
|
Attachment E2 |
|
Draft IEEE 802.3 to IEC TC86 and ISO/IEC SC25 : Regarding new Multimode Fibers (MMFs) |
|
Attachment E3 |
|
Draft IEEE 802.3 to TIA TR42: Liaison Reply to Insight regarding 2-row MPO MDIs liaison slides |
|
Attachment E4 |
|
Draft IEEE 802.3 to UEC, OIF, UALink, ITU-T, INCITS: Forwarding IEEE P802.3dj D3.0 |
|
Attachment E5 |
|
Draft IEEE 802.3 to ITU-T: Response to SG15-LS58, “LS/r on the development of weakly-coupled multi-core fibre Recommendations” |
|
| Final Outgoing Liaison Letters and Liaison Contribution |
|
Attachment F1 |
|
IEEE 802.3 to UEC, OIF, UALink, ITU-T, INCITS: IEEE 802.3 Ethernet 400 Gbps/lane Signaling (400GPL) Study Group< |
|
Attachment F2 |
|
IEEE 802.3 to IEC TC86 and ISO/IEC SC25 : Regarding new Multimode Fibers (MMFs) |
|
Attachment F3 |
|
IEEE 802.3 to TIA TR42: Liaison Reply to Insight regarding 2-row MPO MDIs liaison slides |
|
Attachment F4 |
|
IEEE 802.3 to UEC, OIF, UALink, ITU-T, INCITS:: Forwarding IEEE P802.3dj D3.0 |